3907 Cologne Ln
Austin, TX 78727
3907 Cologne Ln: 1 project on record
City of Austin lists 1 filing across 1 project at 3907 Cologne Ln, Austin, TX 78727. The most recent, filed October 7, 2024, covers: “Ev install”.
Compiled from City of Austin records · updated Oct 7, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Oct 7, 2024
- since Oct 7, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledEv install
- AppliedSep 30, 2024
- IssuedOct 7, 2024
- WorkOct '24 – Oct '24
- Final inspectionOct 17, 2024
Passed final inspection Oct 17, 2024.
1 contact on this project · 1 phone number
Permit & project history
1 projectEv install
Ev install
City of Austin permitElectrical PermitFinal- Record
- 2024-132130 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 3907 Cologne Ln
What is being built at 3907 Cologne Ln?
The latest filing (City of Austin permit 2024-132130 EP, October 7, 2024) covers ev install.
How many permits and filings does 3907 Cologne Ln have?
1 filing across 1 project, from October 7, 2024 to October 7, 2024.
Is there other construction near 3907 Cologne Ln?
Yes. Nearby filings include 3905 Cologne Ln (upgrade main electric service to 200 amps and install evse, Sep 23, 2024); 3903 Cologne Ln (install a new 200a ug surface mount ringless with lever bypass meter socket and a new adjacent 200/200 exterior surface mount load center. 50ââ trenching back to the pull box will be required at least 24 underground through 3 schedule-80 pvc conduit to comply with utility requirements, Apr 25, 2024); 3911 Cologne Ln (emergency. meter block broke when ae was replacing meter so we had to do a complete service rebuild, Mar 11, 2024).
How do I get alerts for new permits at 3907 Cologne Ln?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78727- 3905 Cologne LnSep 23, 2024Upgrade main electric service to 200 amps and install evse · 20 m away
- 3903 Cologne LnApr 25, 2024Install a new 200a ug surface mount ringless with lever bypass meter socket and a new adjacent 200/200 exterior surface mount load center. 50ââ trenching back to the pull box will be required at least 24 underground through 3 schedule-80 pvc conduit to comply with utility requirements · 36 m away
- 3911 Cologne LnMar 11, 2024Emergency. meter block broke when ae was replacing meter so we had to do a complete service rebuild · 37 m away
- 3906 Cologne LnSep 12, 2024Interior remodel · 57 m away
- 12115 Mosley LnSep 18, 2026Add ev car charger to exterior near panel · 70 m away
- 3806 Skipton DrMay 29, 2026Replacement of complete existing central heat and air system with or without duct work changeout · 75 m away
- 12110 Mosley LnNov 14, 2023Replacement of an existing water heater · 84 m away
- 12108 Mosley LnJul 23, 2025Replacement of complete existing central heat and air system with or without duct work like for like: 4 ton gas system · 88 m away
- 3901 Skipton DrMay 7, 2026Full service upgrade to 200a. replace existing main electric panel with new 200a rated main electric panel. includes new 200a meter can. includes all new circuit breakers new whole home surge protector and updated bonding and grounding. also includes installation of a level 2 ev charger to be mounted on exterior of garage · 90 m away
- 3903 Tattershall LnSep 24, 2026Interior kitchen wall to be removed to maximize open space · 97 m away
- 3838 Cologne LnMar 12, 2024Install automatic irrigation system using city potable water · 100 m away
- 3909 Skipton DrOct 23, 2026New irrigation install for landscape areas · 103 m away