4600 Destinys Gate Dr
Austin, TX 78727
Generator gas line and transfer switch work in Austin
Permits indicate gas-line work for a generator and installation of a 200-amp transfer switch at this residence. The City of Austin permits were filed October 24 and November 27, 2025, and both are marked final.
Summarized from City of Austin records · updated Nov 27, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Nov 27, 2025
- since Oct 24, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledInstallation of a gas line to a generator from meter along the side of the house
- AppliedNov 21, 2025
- IssuedNov 27, 2025
- WorkNov '25 – Dec '25
- Final inspectionDec 22, 2025
Passed final inspection Dec 22, 2025.
1 contact on this project · 1 phone number
Permit & project history
2 projectsInstallation of a gas line to a generator from meter along the side of the house
Installation of a gas line to a generator from meter along the side of the house
City of Austin permitPlumbing PermitFinal- Record
- 2025-150356 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Request to disconnect installation of 200 amp transfer switch on service with existing 200 amp meter can to remain
Request to disconnect installation of 200 amp transfer switch on service with existing 200 amp meter can to remain
City of Austin permitElectrical PermitFinal- Record
- 2025-134808 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 4600 Destinys Gate Dr
What is being built at 4600 Destinys Gate Dr?
City of Austin permits indicate work on a generator gas line and a 200-amp transfer switch at the residence. The records do not indicate a new building.
Is a new home being built at 4600 Destinys Gate Dr in Austin?
The permits describe gas-line and electrical work at a residence, not construction of a new home.
What does permit 2025-150356 PP cover?
The plumbing permit, filed November 27, 2025, covers installing a gas line from the meter along the side of the house to a generator. Its status is final.
What does permit 2025-134808 EP cover?
The electrical permit, filed October 24, 2025, covers a request to disconnect and install a 200-amp transfer switch while keeping the existing 200-amp meter can. Its status is final.
When were permits filed for work at 4600 Destinys Gate Dr?
The City of Austin records list an electrical permit filed October 24, 2025, and a plumbing permit filed November 27, 2025. Both are marked final.
Also being built nearby
All of 78727- 4601 Tamarack TrlMay 21, 2024Replacement of complete existing central heat and air system with or without duct work · 33 m away
- 4601 Destinys Gate DrJul 9, 2026Level 2 charger circuit for ae rebate · 56 m away
- 4525 Destinys Gate DrJul 13, 2026Ev charger installation · 59 m away
- 4505 Tamarack TrlJan 8, 2024*request to disconnect* 200amp overhead service replacement only · 74 m away
- 4508 Destinys Gate DrNov 10, 2025Replacement of complete existing central heat and air system with or without duct work · 77 m away
- 4508 Tamarack TrlFeb 3, 2026Replacement of an existing water heater replace 30 gallons gas water heater location: closet inside home · 84 m away
- 12825 Council Bluff DrJun 16, 2025Replacement of an existing water heater · 87 m away
- 12833 Council Bluff DrJul 6, 2026Ev install · 92 m away
- 12817 Council Bluff DrNov 7, 2025Replacement of complete existing central heat and air system with or without duct work · 93 m away
- 4700 Destinys Gate DrJun 2, 2026Wiring of a 160 square ft office in the backyard left side of the house. [no plubming] · 100 m away
- 4501 Tamarack TrlJun 21, 2024*partial demolition* retroactive covered porch addition partial garage conversion interior remodel · 119 m away
- 4507 Oak Creek DrJun 20, 2024Express: replace 1 window like for like · 125 m away