groundranger
Recent · latest filing Jan 2026Residential

4702 Callisto Ter

Austin, TX 78727

Bathroom tub/shower conversion permitted at 4702 Callisto Ter

Permits indicate a tub/shower conversion and replacement of existing bathroom floor tile at this Austin home. The building permit was filed January 2, 2026, and the plumbing permit was filed January 14, 2026; both are listed as final.

Summarized from City of Austin records · updated Jan 14, 2026

Projects
2
2 filings
Latest filing
Jan 14, 2026
since Jan 2, 2026
Largest scope
—
Listed value
—

Where this project stands

Finaled

Express- tub/shower conversion and existing bathroom floor tile replacement. insulation for sound proofing will be added along interior shower walls

  1. AppliedJan 2, 2026
  2. IssuedJan 14, 2026
  3. WorkJan '26 – Feb '26
  4. Final inspectionFeb 25, 2026

Passed final inspection Feb 25, 2026.

1 contact on this project · 1 phone number

Permit & project history

2 projects
  1. Express- tub/shower conversion and existing bathroom floor tile replacement. insulation for sound proofing will be added along interior shower walls

    Express- tub/shower conversion and existing bathroom floor tile replacement. insulation for sound proofing will be added along interior shower walls

    City of Austin permitPlumbing PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Express- tub/shower conversion and existing bathroom floor tile replacement. insulation for sound proofing will be added along interior shower walls

    Express- tub/shower conversion and existing bathroom floor tile replacement. insulation for sound proofing will be added along interior shower walls

    City of Austin permitBuilding PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 4702 Callisto Ter

What is being changed at 4702 Callisto Ter?

City of Austin permits describe a tub/shower conversion, replacement of existing bathroom floor tile, and soundproofing insulation along the interior shower walls.

When were permits filed for the bathroom work?

The building permit, 2026-000200 BP, was filed January 2, 2026. The plumbing permit, 2026-000200 PP, was filed January 14, 2026.

What do permits 2026-000200 BP and 2026-000200 PP cover?

Both permits describe the tub/shower conversion, bathroom floor tile replacement, and insulation along the interior shower walls. The building permit is dated January 2, 2026, and the plumbing permit is dated January 14, 2026.

Is a new home being built at 4702 Callisto Ter?

The records describe bathroom work at an existing home, not new home construction.

What's being permitted near 4801 E Parmer?

At 4702 Callisto Ter, about 42 meters from 4801 E Parmer, permits indicate a tub/shower conversion and bathroom floor tile replacement. The building and plumbing permits are both listed as final.

Also being built nearby

All of 78727
Email me when a new permit is filed