4705 Hawkhaven Ln
Austin, TX 78727
4705 Hawkhaven Ln: 1 project on record
City of Austin lists 1 filing across 1 project at 4705 Hawkhaven Ln, Austin, TX 78727. The most recent, filed November 21, 2024, covers: “Change-out water heater to existing residence”.
Compiled from City of Austin records · updated Nov 21, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Nov 21, 2024
- since Nov 21, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledChange-out water heater to existing residence
- AppliedJul 16, 2013
- IssuedNov 21, 2024
- WorkNov '24 – May '25
- Final inspectionDec 9, 2024
Passed final inspection Dec 9, 2024.
1 contact on this project · 1 phone number
Permit & project history
1 projectChange-out water heater to existing residence
Change-out water heater to existing residence
City of Austin permitPlumbing PermitFinal- Record
- 2013-073151 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 4705 Hawkhaven Ln
What is being built at 4705 Hawkhaven Ln?
The latest filing (City of Austin permit 2013-073151 PP, November 21, 2024) covers change-out water heater to existing residence.
How many permits and filings does 4705 Hawkhaven Ln have?
1 filing across 1 project, from November 21, 2024 to November 21, 2024.
Is there other construction near 4705 Hawkhaven Ln?
Yes. Nearby filings include 4700 Hawkhaven Ln (panel and meter upgrade, Aug 10, 2026); 12303 Bedrock Trl (replacement of complete existing central heat and air system with or without duct work replacement of 2.5t vertical like-for-like gas system, Dec 17, 2025); 4711 Hawkhaven Ln (replacement of an existing water heater, Jan 23, 2024).
How do I get alerts for new permits at 4705 Hawkhaven Ln?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78727- 4700 Hawkhaven LnAug 10, 2026Panel and meter upgrade · 49 m away
- 12303 Bedrock TrlDec 17, 2025Replacement of complete existing central heat and air system with or without duct work replacement of 2.5t vertical like-for-like gas system · 53 m away
- 4711 Hawkhaven LnJan 23, 2024Replacement of an existing water heater · 55 m away
- 12301 Bedrock TrlJun 29, 2025Upgrade main electric service. install evse · 70 m away
- 4700 Pelham DrMay 29, 2024Request to disconnect - replace exterior 125-amp main breaker panel and interior sub-panel in garage · 74 m away
- 4708 Hawkhaven LnMay 16, 2025Replace waterheater · 86 m away
- 12308 Turtleback LnSep 25, 2024Replacement of complete existing central heat and air system with or without duct work · 96 m away
- 12306 Bedrock TrlFeb 17, 2026Ev charger installation · 104 m away
- 4707 Pelham DrSep 12, 2024Remove stainless steel natural gas line to install black iron piping with appropriate natural gas shut off. gas line is located on the outside of the house on the right side · 108 m away
- 4613 Hawkhaven LnJun 3, 2025Replacement of complete existing central heat and air system with or without duct work · 112 m away
- 4709 Pelham DrMar 28, 2024New 1-story accessory structure consisting of an office flex room and unconditioned storage room with full bathroom and covered porch. revision 1: revise scope of work to add kitchen to structure to create a 1-story 1 bedroom 1 bathroom dwelling unit. footprint of structure will remain the same. new uncovered wood deck · 113 m away
- 12317 Bedrock TrlFeb 15, 2025Remove existing panel and meter can. install 150amp mb panel and 200amp bypass meter can. underground service from transformer on back right of property · 113 m away