4918 Transit Cir
Austin, TX 78727
4918 Transit Cir: 1 project on record
City of Austin lists 1 filing across 1 project at 4918 Transit Cir, Austin, TX 78727. The most recent, filed January 13, 2025, covers: “Replacement of complete existing central heat and air system with or without duct work like for like system change out - installing 2.5 ton day and night straight cool”.
Compiled from City of Austin records · updated Jan 13, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Jan 13, 2025
- since Jan 13, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of complete existing central heat and air system with or without duct work like for like system change out - installing 2.5 ton day and night straight cool
- AppliedDec 11, 2024
- IssuedJan 13, 2025
- WorkJan '25 – Jan '25
- Final inspectionJan 23, 2025
Passed final inspection Jan 23, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplacement of complete existing central heat and air system with or without duct work like for like system change out - installing 2.5 ton day and night straight cool
Replacement of complete existing central heat and air system with or without duct work like for like system change out - installing 2.5 ton day and night straight cool
City of Austin permitMechanical PermitFinal- Record
- 2024-161855 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 4918 Transit Cir
What is being built at 4918 Transit Cir?
The latest filing (City of Austin permit 2024-161855 MP, January 13, 2025) covers replacement of complete existing central heat and air system with or without duct work like for like system change out - installing 2.5 ton day and night straight cool.
How many permits and filings does 4918 Transit Cir have?
1 filing across 1 project, from January 13, 2025 to January 13, 2025.
Is there other construction near 4918 Transit Cir?
Yes. Nearby filings include 4916 Transit Cir (install evse, Jul 20, 2024); 12603 Europa Ln (install new 14.96 kw dc rooftop solar system and 15.0 kwh energy storage system to existing residential, Sep 9, 2026); 4915 Transit Cir (gas test and add gas to furnace install tub, Dec 18, 2024).
How do I get alerts for new permits at 4918 Transit Cir?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78727- 4916 Transit CirJul 20, 2024Install evse · 17 m away
- 12603 Europa LnSep 9, 2026Install new 14.96 kw dc rooftop solar system and 15.0 kwh energy storage system to existing residential · 35 m away
- 4915 Transit CirDec 18, 2024Gas test and add gas to furnace install tub · 50 m away
- 4911 Transit CirApr 19, 2024Replace existing branch duct supply air plenum collars dampers and supply air grilles · 62 m away
- 4915 Ganymede DrFeb 26, 2024Dig up and replace sewer yard line from house to city tap only · 83 m away
- 12604 Europa LnFeb 10, 2026Ev install · 90 m away
- 5001 Ganymede DrJul 31, 2024Replacement of complete existing central heat and air system with or without duct work · 97 m away
- 12608 Andromeda CvFeb 7, 2025Replacement of an existing water heater · 101 m away
- 12610 Andromeda CvJul 10, 2026Express- remove and replace 9 windows and 2 sliding patio doors with pella impervia products including installation exterior siding/sheetrock adjustments egress cut and new sill work as noted in contract · 124 m away
- 12611 Andromeda CvNov 26, 2025Installing tankless g water heater * tankless water heater installed not tanked __cm · 154 m away
- 4807 Ganymede DrJun 10, 2026Replacement of complete existing central heat and air system with or without duct work · 170 m away
- 12705 Rhea CtMay 28, 2026Replacement of an existing water heater · 172 m away