EMS Station #10 additions and renovations planned on Duval Road

Plans indicate additions and renovations at Austin EMS Station #10, 5228 Duval Road. The latest site plan case, 12623138, was approved and released on July 18, 2025; an earlier site plan case was approved and released on October 24, 2023. An irrigation installation permit was finalized on April 18, 2025.

Summarized from City of Austin records · updated Jul 18, 2025

Projects
10
10 filings
Latest filing
Jul 18, 2025
since Oct 24, 2023
Largest scope
—
Listed value
—

Where this project stands

Finaled

Irrigation system installation

  1. AppliedDec 24, 2024
  2. IssuedApr 18, 2025
  3. WorkApr '25 – May '25
  4. Final inspectionMay 7, 2025

Passed final inspection May 7, 2025.

Permit & project history

10 projects
  1. EMS Station #10 Additions and Renovations

    Ems station #10 additions and renovations

    City of Austin casesite_planApproved and Released
    Record
    12623138
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Irrigation system installation

    Irrigation system installation

    City of Austin permitPlumbing PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  3. Confirmation of final restoration from the inspector is attached with the permit. -**rs** cip id# 10737.005 cip project manager - william r. massingill cip inspector - david garcia construct new driveway approaches of 29.93ft (phase 1) and 21.83ft (phase 2) and sidewalks of 30.3 (11.88 & 18.42) lf and curb & gutter of 18 ft. phase #1 is scheduled for 06/17-07/01 this will involve demolishing +- 30 lf of the first driveway apron (larger driveway entrance). during phase #1 spawglass will also be demolishing +- 58 lf of curb/gutter & 54 lf of sidewalk behind duval rd. until phase 1 is complete we will be using the phase 2 entrance (2nd/smaller driveway entrance) to place & finish this area on the building side. the concrete truck will enter the jobsite & pour from inside the jobsite fence. phase #1s traffic control closure will be what is shown on sheet c703 per approved tcp. phase #2 is scheduled for 07/01-07/15 spawglass will be demolishing/re-installing 30.3 lf of new sidewalk & 21.83 lf of new driveway apron and 18 ft c&g. all of this work will be accessed within the limits of construction behind the curb of duval. phase #2s traffic control closure will be what is shown on sheet c703a per approved tcp

    Confirmation of final restoration from the inspector is attached with the permit. -**rs** cip id# 10737.005 cip project manager - william r. massingill cip inspector - david garcia construct new driveway approaches of 29.93ft (phase 1) and 21.83ft (phase 2) and sidewalks of 30.3 (11.88 & 18.42) lf and curb & gutter of 18 ft. phase #1 is scheduled for 06/17-07/01 this will involve demolishing +- 30 lf of the first driveway apron (larger driveway entrance). during phase #1 spawglass will also be demolishing +- 58 lf of curb/gutter & 54 lf of sidewalk behind duval rd. until phase 1 is complete we will be using the phase 2 entrance (2nd/smaller driveway entrance) to place & finish this area on the building side. the concrete truck will enter the jobsite & pour from inside the jobsite fence. phase #1s traffic control closure will be what is shown on sheet c703 per approved tcp. phase #2 is scheduled for 07/01-07/15 spawglass will be demolishing/re-installing 30.3 lf of new sidewalk & 21.83 lf of new driveway apron and 18 ft c&g. all of this work will be accessed within the limits of construction behind the curb of duval. phase #2s traffic control closure will be what is shown on sheet c703a per approved tcp

    City of Austin permitDriveway / SidewalksFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  4. 113 of 6 dl pipe fittings and 6 watts 709 dcda to stub up in the building ref 2022-054433 bp ref. sp-93-0512 cs for the stub out only

    113 of 6 dl pipe fittings and 6 watts 709 dcda to stub up in the building ref 2022-054433 bp ref. sp-93-0512 cs for the stub out only

    City of Austin permitPlumbing PermitExpired
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  5. 26091 - coa ems 10 medic 10

    26091 - coa ems 10 medic 10

    City of Austin permitElectrical PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  6. 26091 - coa ems 10 buidling id engine 25

    26091 - coa ems 10 buidling id engine 25

    City of Austin permitElectrical PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  7. Addition and remodel to existing ems/fire station. project involves expansion of existing vehicle bays and replacement of existing living quarters with a new two-story living quarters built over the existing footprint

    Addition and remodel to existing ems/fire station. project involves expansion of existing vehicle bays and replacement of existing living quarters with a new two-story living quarters built over the existing footprint

    City of Austin permitMechanical PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  8. EMERGENCY MEDICAL STATION #10

    Emergency medical station #10

    City of Austin casesite_planApproved and Released
    Record
    153242
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  9. In building fireline install reference: 2022-054433 bp

    In building fireline install reference: 2022-054433 bp

    City of Austin permitPlumbing PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  10. Ems 10 – 2021-009044 sp (job site address: 5228 duval rd. austin tx 78727) water waste water and storm utilities juan beltan instructed us to apply this way

    Ems 10 – 2021-009044 sp (job site address: 5228 duval rd. austin tx 78727) water waste water and storm utilities juan beltan instructed us to apply this way

    City of Austin permitPlumbing PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 5228 Duval Rd

What is being built at 5228 Duval Road in Austin?

City records describe additions and renovations to Austin EMS Station #10. The latest related site plan case, 12623138, was approved and released on July 18, 2025.

Is a new EMS station planned at 5228 Duval Road?

Records identify the site as Emergency Medical Station #10 and describe additions and renovations, not a new station. A site plan case was approved and released on July 18, 2025.

When were plans for the EMS Station #10 project approved?

Two site plan cases are listed as approved and released: case 153242 on October 24, 2023, and case 12623138 on July 18, 2025.

What permits have been filed for 5228 Duval Road?

City of Austin records list two site plan cases for EMS Station #10 additions and renovations. They also show an irrigation system installation permit, 2024-166478 PP, finalized on April 18, 2025.

What's being planned near Davis Elementary School's restroom renovation on Duval Road?

At 5228 Duval Road, about 105 meters from the Davis Elementary School Special Education Restroom Renovation, plans indicate additions and renovations to EMS Station #10. The latest site plan case was approved and released on July 18, 2025.

When is the EMS Station #10 renovation expected to be finished?

The records provided list site plan approvals and an irrigation permit, but do not give a construction completion date.

Also being built nearby

All of 78727

More medical facilities in 78727.

Email me when a new permit is filed