5803 Avery Island Ave

Austin, TX 78727

Permits cover rooftop solar, panel upgrades and an EV charger

City of Austin permits indicate an 8.20 kW rooftop solar system, a main panel upgrade and an EV charger at 5803 Avery Island Ave. The solar and electrical work was permitted on April 29 and September 18, 2025.

Summarized from City of Austin records · updated Sep 18, 2025

Projects
2
2 filings
Latest filing
Sep 18, 2025
since Apr 29, 2025
Largest scope
—
Listed value
—

Where this project stands

Finaled

Request to disconnect* conduct a main panel upgrade and install an ev charger during the mpu we will install a 200amp main service panel with a 200amp rated meter enclosure and raise the meter 2 inches as its below aes minimum height standard

  1. AppliedMay 1, 2025
  2. IssuedSep 18, 2025
  3. WorkSep '25 – Oct '25
  4. Final inspectionOct 27, 2025

Passed final inspection Oct 27, 2025.

1 contact on this project · 1 phone number

Permit & project history

2 projects
  1. Request to disconnect* conduct a main panel upgrade and install an ev charger during the mpu we will install a 200amp main service panel with a 200amp rated meter enclosure and raise the meter 2 inches as its below aes minimum height standard

    Request to disconnect* conduct a main panel upgrade and install an ev charger during the mpu we will install a 200amp main service panel with a 200amp rated meter enclosure and raise the meter 2 inches as its below aes minimum height standard

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. We will install a 8.20kw roof mount solar system conduct a main panel upgrade and install an ev charger

    We will install a 8.20kw roof mount solar system conduct a main panel upgrade and install an ev charger

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 5803 Avery Island Ave

What work is permitted at 5803 Avery Island Ave?

City of Austin permits cover an 8.20 kW rooftop solar system, main panel upgrades and an EV charger. The permits were filed April 29 and September 18, 2025.

Is solar being installed at 5803 Avery Island Ave?

A City of Austin electrical permit filed April 29, 2025, describes installation of an 8.20 kW roof-mounted solar system.

Is an EV charger being installed at 5803 Avery Island Ave?

Yes. City of Austin electrical permit 2025-054103 EP, filed September 18, 2025, describes an EV charger installation along with a main panel upgrade.

What electrical work is planned at 5803 Avery Island Ave?

Permits describe a main panel upgrade, an EV charger and a 200-amp main service panel with a 200-amp-rated meter enclosure. Permit 2025-054103 EP was filed September 18, 2025.

When were the permits filed for work at 5803 Avery Island Ave?

The solar permit, 2025-051093 EP, was filed April 29, 2025. A later electrical permit, 2025-054103 EP, was filed September 18, 2025.