14415 Owen Tech Blvd
Austin, TX 78728 · Biolife Plasma Services LP
BioLife plans 6,000-square-foot medical office renovation
A 6,000-square-foot interior renovation of an existing medical office at 14415 Owen Tech Blvd was registered with TDLR on April 26, 2024. The scope includes new walls, ceilings, finishes, plumbing fixtures, mechanical devices and electrical work. TDLR lists an estimated project cost of $1.2 million and the registration as closed.
Summarized from Texas Department of Licensing and Regulation, City of Austin records · updated Apr 26, 2024
- Projects
- 2
- 2 filings
- Latest filing
- Apr 26, 2024
- since Feb 4, 2021
- Largest scope
- 6,000 sf
- Estimated cost
- $1.2M
- state registration
Where this project stands
CompletedBioLife Remodel
6,000 sq ft · $1.2M est.
- RegisteredApr 26, 2024
- Plan review
- ConstructionAug '24 – Nov '24
- Inspected
- Closed
Ran as a 3-month build.
4 contacts on this project · 2 phone numbers
Permit & project history
2 projectsThis project consists of a 6,000 sq ft interior renovation of an existing medical office. scope will include the removal and install of new walls, ceilings, finishes, plumbing fixtures, mechanical devices, and electrical. — biolife plasma services
TDLR project registrationRenovation/AlterationProject Closed6,000 sq ft$1.2M est.- Project #
- TABS2024017133
- Tenant / owner
- Biolife Remodel
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation · City of Austin
Questions about 14415 Owen Tech Blvd
What is being built at 14415 Owen Tech Blvd in Austin?
The records describe a 6,000-square-foot interior renovation of an existing medical office for BioLife Plasma Services. The work includes new walls, ceilings, finishes, plumbing fixtures, mechanical devices and electrical work.
Is a new building going up at 14415 Owen Tech Blvd?
The latest record describes an interior renovation of an existing medical office, not a new building. TDLR registered the project on April 26, 2024, under number TABS2024017133.
When was the BioLife renovation registered?
The TDLR project registration is dated April 26, 2024. Its status is listed as Project Closed.
How large is the BioLife project in Austin?
The renovation covers 6,000 square feet inside an existing medical office at 14415 Owen Tech Blvd.
What is the estimated cost of the BioLife renovation?
The TDLR registration lists an applicant-estimated project cost of $1.2 million. This is an estimate for the project, not a confirmed final cost.
What is going on near Renaissance Education Foundation on Owen-Tech Blvd?
At 14415 Owen Tech Blvd, records describe a 6,000-square-foot interior renovation of an existing medical office for BioLife Plasma Services. The site is about 107 meters from Renaissance Education Foundation.
Was an addition approved at the BioLife site in Austin?
A City of Austin site-plan case named “BioLife Plasma Services Addition” was approved and released on February 4, 2021. The record does not specify the addition’s size.
Also being built nearby
All of 78728- 14401 Owen Tech BlvdMar 2, 2007Austin north service center · 46 m away
- 14401 Owen-Tech Blvd, Austin, TX 78728 · Renaissance Education FoundationJun 27, 2024Renaissance academy - portable additions — additions to existing building — installing a new 2-portables next to the existing building · 107 m away
- 14500 Owen Tech BlvdNov 4, 2014Affinity at wells branch · 133 m away
- 14209-1/2 IH 35 SvrdFeb 27, 2020The lakes at techridge office park phase ii · 227 m away
- 14509 Owen Tech BlvdMar 2, 2007Wells branch self storage · 232 m away
- 14205-1/2 IH 35 SvrdAug 20, 2018Lakes of techridge · 245 m away
- 14301 IH 35 SvrdSep 24, 2026Lakes at techridge, amended plat of lot 1 and lot 5 resub of lot1b, block a · 248 m away
- 14201 IH 35 SvrdAug 16, 2016The oaks at techridge phase v · 307 m away
- 1763 Wells Branch PkwyMar 2, 2007Parkway storage · 309 m away
- 1731 Wells Branch PkwyJul 29, 2025Austin auto planet · 351 m away
- 14501 IH 35 SvrdMar 2, 2007Cook walden capital parks cemetery-private road improvement (site plan extension · 357 m away
- 14200 IH 35 SvrdFeb 21, 2025Owen-tech boulevard widening · 357 m away