14533 Donald Dr
Austin, TX 78728
3.8-kW rooftop solar system permitted at Austin home
Austin permits filed May 21 and May 26, 2026, indicate work to add a 3.8-kW rooftop solar system to an existing residence at 14533 Donald Dr. The permits also cover connecting the solar equipment and upgrading the electrical service and meter to 200 amps.
Summarized from City of Austin records · updated May 26, 2026
- Projects
- 2
- 2 filings
- Latest filing
- May 26, 2026
- since May 21, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledHarrell - 39-65378 - install new 3.8 kw rooftop solar system to existing residential only using backfed breaker only
- AppliedApr 30, 2026
- IssuedMay 26, 2026
- WorkMay '26 – Jun '26
- Final inspectionJun 23, 2026
Passed final inspection Jun 23, 2026.
1 contact on this project · 1 phone number
Permit & project history
2 projectsHarrell - 39-65378 - install new 3.8 kw rooftop solar system to existing residential only using backfed breaker only
Harrell - 39-65378 - install new 3.8 kw rooftop solar system to existing residential only using backfed breaker only
City of Austin permitElectrical PermitFinal- Record
- 2026-053893 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Harrell - 39-65378- disconnect/reconnect power to tie in pv component and upgrading msp to 200 amps. 200 amp main breaker. upgrading revenue meter to 200 amps. requesting wire pull
Harrell - 39-65378- disconnect/reconnect power to tie in pv component and upgrading msp to 200 amps. 200 amp main breaker. upgrading revenue meter to 200 amps. requesting wire pull
City of Austin permitElectrical PermitFinal- Record
- 2026-054068 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 14533 Donald Dr
What is being built at 14533 Donald Dr in Austin?
City of Austin permits indicate a 3.8-kW rooftop solar system is being installed at the existing residence, along with electrical service upgrades.
Is a new house being built at 14533 Donald Dr?
The records describe work at an existing residence, not construction of a new house.
When were the solar permits filed for 14533 Donald Dr?
The two electrical permits were filed May 21 and May 26, 2026. Both records show final status.
What electrical work is planned at 14533 Donald Dr?
Permit 2026-054068 EP covers disconnecting and reconnecting power to tie in the solar equipment and upgrading the main service and revenue meter to 200 amps.
How large is the solar system at 14533 Donald Dr?
Permit 2026-053893 EP describes a new 3.8-kW rooftop solar system at the existing residence.
Also being built nearby
All of 78728- 14650 Merrilltown DrMar 2, 2007Wells branch elementary school additions · 191 m away
- 14605 Plain Rock PassNov 18, 2026Base: installing a backup battery system and additional meter socket · 216 m away
- 14610 Gold Fish Pond AveJun 19, 2026Services upgrade from a 150amps to a 200amp · 230 m away
- 14402 Tiffer LnOct 28, 202424 tunnel to repair broken sewer piping. 3 access holes outside of foundation start date 10/2/2024 · 230 m away
- 14735 Bratton LnAug 19, 2026****void per chad watson outside coa area void***replace failed grease trap in rear of unit 310 · 244 m away
- 14604 Gold Fish Pond AveFeb 2, 2024***emergency*** replace underground meter and 200 amp panel · 258 m away
- 2411 Water Well LnFeb 28, 2025Change out meter can to 200a and replace existing service panel · 258 m away
- 14537 Robert I Walker BlvdNov 28, 2023Replacement of an existing water heater · 280 m away
- 14600 Gold Fish Pond AveSep 23, 2025Replacement of an existing water heater change out: install/ replace 40 gallon tank-type natural gas water heater · 282 m away
- 2318 Klattenhoff DrMar 18, 2024Rooftop solar pv installation. existing system will be removed and replaced · 287 m away
- 2602 Water Well LnMar 17, 2025Etj property- will need ae to disconnect the service for scope of work. in this property the outlets switches and lights will be replaced and a disconnect will be installed · 302 m away
- 2307 Water Well LnFeb 9, 2026Replace meter base (underground) replace main breaker panel (200 amp); install complete grounding and bonding system; install surge protection; install dedicated ev circuit (50 amp); install dedicated microwave circuit (20 amp) · 310 m away
More solar installs in 78728.