5800 Mcneil Drive
Austin, TX 78728 · Round Rock Independent School District
Hartfield Performing Arts Center renovation in Austin
A renovation of Round Rock ISD’s Raymond E. Hartfield Performing Arts Center at 5800 McNeil Drive was registered with TDLR on April 28, 2026. The 7,600-square-foot project includes roof and mechanical equipment replacement, a PA system upgrade, fire-line rerouting work, and lobby and green room renovations. The applicant estimates the project cost at $6 million.
Summarized from Texas Department of Licensing and Regulation records · updated Apr 28, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Apr 28, 2026
- since Apr 28, 2026
- Largest scope
- 7,600 sf
- Estimated cost
- $6.0M
- state registration
Where this project stands
Approved · construction starts Jun 1, 2027Round Rock ISD Hartfield PAC Renovation
7,600 sq ft · $6.0M est.
- RegisteredApr 28, 2026
- Plan review
- ConstructionJun '27 – Sep '27
- Inspected
- Closed
A 3-month build is scheduled. Bids for subcontractors and suppliers usually close before the start date.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectTotal roof replacement, mechanical equipment replacement, pa system upgrade, civil work related to fire line rerouting, interior renovation including replacement of flooring and wall finishes at the lobby and green room — raymond e. hartfield performing arts center
TDLR project registrationRenovation/AlterationReview Complete7,600 sq ft$6.0M est.- Project #
- TABS2026018815
- Tenant / owner
- Round Rock ISD Hartfield Pac Renovation
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 5800 Mcneil Drive
What is being built at 5800 McNeil Drive in Austin?
The project is a renovation of the Raymond E. Hartfield Performing Arts Center, not a new building. The TDLR registration lists roof and mechanical equipment replacement, a PA system upgrade, fire-line rerouting work, and interior updates.
When was the Hartfield Performing Arts Center renovation registered?
The TDLR project registration was filed on April 28, 2026. Its listed status is Review Complete.
What work is planned at the Hartfield Performing Arts Center?
The scope includes replacing the roof and mechanical equipment, upgrading the PA system, and civil work related to rerouting a fire line. It also includes new flooring and wall finishes in the lobby and green room.
How much will the Hartfield PAC renovation cost?
The TDLR registration lists an applicant-estimated project cost of $6 million.
How large is the Hartfield Performing Arts Center renovation?
The TDLR registration lists the project at 7,600 square feet.
What's being renovated near Round Rock ISD McNeil High School Phase 3?
The Raymond E. Hartfield Performing Arts Center at 5800 McNeil Drive is slated for renovation. TDLR registered the project on April 28, 2026.
Also being built nearby
All of 78728- 5807 Mc Neil DrDec 15, 2025Install gas pipping overhead for boilers · 118 m away
- 5703 Mc Neil DrMar 2, 2007Presbyterian church of the hills · 212 m away
- 5720 Mc Neil DrAug 7, 2026Mcneil high school turf fields · 271 m away
- 5549 Mc Neil DrApr 7, 2026Hawthorne on mcneil multifamily · 447 m away
- 5547 Mc Neil DrFeb 25, 2008Uncle bob's storage · 482 m away
- 5720 Mcneil Dr · Round Rock Independent School DistrictMar 6, 2026Round rock isd mcneil hs phase 3 — renovation/alteration — major renovation of portions of existing high school buildings · 497 m away