12631 Oro Valley Trl
Austin, TX 78729
12631 Oro Valley Trl: 2 projects on record
City of Austin lists 2 filings across 2 projects at 12631 Oro Valley Trl, Austin, TX 78729 since May 17, 2024. The most recent, filed May 21, 2024, covers: “Webber - install new _7.2__kw rooftop solar system to existing residential only using backfed breaker”.
Compiled from City of Austin records · updated May 21, 2024
- Projects
- 2
- 2 filings
- Latest filing
- May 21, 2024
- since May 17, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledWebber - install new _7.2__kw rooftop solar system to existing residential only using backfed breaker
- AppliedMay 14, 2024
- IssuedMay 21, 2024
- WorkMay '24 – Oct '24
- Final inspectionOct 21, 2024
Passed final inspection Oct 21, 2024.
1 contact on this project · 1 phone number
Permit & project history
2 projectsWebber - install new _7.2__kw rooftop solar system to existing residential only using backfed breaker
Webber - install new _7.2__kw rooftop solar system to existing residential only using backfed breaker
City of Austin permitElectrical PermitFinal- Record
- 2024-060868 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Webber - disconnect/reconnect power to tie in pv component and upgrading msp to 200 amps. upgrading revenue meter to 200 amps
Webber - disconnect/reconnect power to tie in pv component and upgrading msp to 200 amps. upgrading revenue meter to 200 amps
City of Austin permitElectrical PermitFinal- Record
- 2024-060885 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 12631 Oro Valley Trl
What is being built at 12631 Oro Valley Trl?
The latest filing (City of Austin permit 2024-060868 EP, May 21, 2024) covers webber - install new _7.2__kw rooftop solar system to existing residential only using backfed breaker.
How many permits and filings does 12631 Oro Valley Trl have?
2 filings across 2 projects, from May 17, 2024 to May 21, 2024.
Is there other construction near 12631 Oro Valley Trl?
Yes. Nearby filings include 12610 Velarde Cv (permit required for outage and service upgrade, Dec 11, 2025); 12701 Modena Trl (upgrade main electrical service, May 9, 2025); 12701 Red Deer Pass (replacement of an existing water heater, Oct 10, 2025).
How do I get alerts for new permits at 12631 Oro Valley Trl?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78729- 12610 Velarde CvDec 11, 2025Permit required for outage and service upgrade · 92 m away
- 12701 Modena TrlMay 9, 2025Upgrade main electrical service · 128 m away
- 12701 Red Deer PassOct 10, 2025Replacement of an existing water heater · 142 m away
- 7825 Elkhorn Mountain TrlAug 11, 2026Re roofing project. sbs and metal panel · 142 m away
- 12600 Velarde CvApr 23, 2024Replace 125amp meter can with 200amp meter can replace 125 amp panel with 125amp panel with main · 157 m away
- 7822 Elkhorn Mountain TrlAug 7, 2026Replacement of an existing water heater · 167 m away
- 7913 Elkhorn Mountain TrlOct 19, 2026Express: replacing 8 windows and 1 door like for like in existing residential area · 175 m away
- 7906 Elkhorn Mountain TrlJul 31, 2025Replacement of complete existing central heat and air system with or without duct work · 179 m away
- 12618 Olympiad DrOct 28, 2024Removing existing solar electrical equipment for repairs and reinstalling solar electrical once repairs are completed. pv system is size is staying the same no change in design · 180 m away
- 8013 Petaca CvSep 23, 2025Replacement of complete existing central heat and air system with or without duct work 1 system: 2 ton 14 seer gas furnace and ac · 181 m away
- 12604 Oro Valley TrlOct 21, 2024Replacement of an existing water heater · 201 m away
- 12708 Tantara DrNov 3, 2026Express: replace 22 windows like for like · 207 m away
More solar installs in 78729.