groundranger
Historic · latest filing Feb 2024Residential

12712 Twisted Briar Ln

Austin, TX 78729

12712 Twisted Briar Ln: 2 projects on record

City of Austin lists 2 filings across 2 projects at 12712 Twisted Briar Ln, Austin, TX 78729. The most recent, filed February 26, 2024, covers: “Install new gas line from meter to generator”.

Compiled from City of Austin records · updated Feb 26, 2024

Projects
2
2 filings
Latest filing
Feb 26, 2024
since Feb 26, 2024
Largest scope
—
Listed value
—

Where this project stands

Finaled

Install new gas line from meter to generator

  1. AppliedFeb 21, 2024
  2. IssuedFeb 26, 2024
  3. WorkFeb '24 – Feb '24
  4. Final inspectionFeb 27, 2024

Passed final inspection Feb 27, 2024.

1 contact on this project · 1 phone number

Permit & project history

2 projects
  1. Install new gas line from meter to generator

    Install new gas line from meter to generator

    City of Austin permitPlumbing PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Installation of new 24kw permanent whole home generator (natural gas) connected to house meter and main panel. no meter can required. (alison urban)

    Installation of new 24kw permanent whole home generator (natural gas) connected to house meter and main panel. no meter can required. (alison urban)

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 12712 Twisted Briar Ln

What is being built at 12712 Twisted Briar Ln?

The latest filing (City of Austin permit 2024-021624 PP, February 26, 2024) covers install new gas line from meter to generator.

How many permits and filings does 12712 Twisted Briar Ln have?

2 filings across 2 projects, from February 26, 2024 to February 26, 2024.

Is there other construction near 12712 Twisted Briar Ln?

Yes. Nearby filings include 12716 Twisted Briar Ln (replacement of an existing water heater, Jan 10, 2025); 12713 Twisted Briar Ln (replace meter base and panel (200amp underground), Nov 15, 2023); 12709 Machete Trl (install new 23 kw-ac energy storage system to existing 11.55 kw-dc rooftop solar only, Oct 21, 2024).

How do I get alerts for new permits at 12712 Twisted Briar Ln?

Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.

Also being built nearby

All of 78729
Email me when a new permit is filed