12800 Turtle Rock Rd
Austin, TX 78729
12800 Turtle Rock Rd: 2 projects on record
City of Austin lists 2 filings across 2 projects at 12800 Turtle Rock Rd, Austin, TX 78729 since February 26, 2008. The most recent, filed March 26, 2008, covers: “Deer park/live oak/dominique sec 2, replat of”.
Compiled from City of Austin records · updated Mar 26, 2008
- Projects
- 2
- 2 filings
- Latest filing
- Mar 26, 2008
- since Feb 26, 2008
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsSources: City of Austin
Questions about 12800 Turtle Rock Rd
What is being built at 12800 Turtle Rock Rd?
The latest filing (City of Austin case 10018156, March 26, 2008) covers deer park/live oak/dominique sec 2, replat of.
How many permits and filings does 12800 Turtle Rock Rd have?
2 filings across 2 projects, from February 26, 2008 to March 26, 2008.
What is being built near Round Rock Independent School District in Austin?
12800 Turtle Rock Rd is about 234 m from Round Rock Independent School District (8849 Anderson Mill Rd). Its latest filing is for deer park/live oak/dominique sec 2, replat of.
Is there other construction near 12800 Turtle Rock Rd?
Yes. Nearby filings include 12833 Turtle Rock Rd (replat of deer park/ live oak/ dominique section two, Dec 15, 2017); 12811 Leatherback Ln (replacement of complete existing central heat and air system with or without duct work, Jun 16, 2025); 8710 Pineridge Dr (replacement of an existing water heater installing like/like e water heater, May 23, 2025).
How do I get alerts for new permits at 12800 Turtle Rock Rd?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78729- 12833 Turtle Rock RdDec 15, 2017Replat of deer park/ live oak/ dominique section two · 139 m away
- 12811 Leatherback LnJun 16, 2025Replacement of complete existing central heat and air system with or without duct work · 147 m away
- 8710 Pineridge DrMay 23, 2025Replacement of an existing water heater installing like/like e water heater · 170 m away
- 8805 Donatello DrAug 1, 2024Install customer provided level 2 evse · 179 m away
- 8708 Pineridge DrJan 28, 2026Our plumber discovered a belly in the sewer yard line located approximately 18 to 42 feet downstream from the cleanout in front of unit b. this section of the line was found to be completely filled with sewer water indicating that remediation is necessary to prevent potential sewer backups in the future. additionally we noted several bulges on the top of the sewer yard line suggesting that the line was not adequately backfilled likely due to rocks making contact with the top of the sewer line · 181 m away
- 12911 Leatherback LnFeb 25, 2025Express - remove existing 18 windows and install new vinyl windows of same size and operation · 198 m away
- 12904 Michelangelo StJun 11, 2024Replacement of an existing water heater · 205 m away
- 12906 Michelangelo StJan 17, 202450 amp nema plug for car charger · 214 m away
- 8849 Anderson Mill Rd · Round Rock Independent School DistrictAug 26, 2026Deerpark middle school additions & renovations — additions to existing building — fine arts and classroom addition at main building, restroom/storage addition at athletics field. miscellaneous interior renovations · 234 m away
- 8863 Anderson Mill RdOct 3, 2024Service upgrade to 400 amps · 259 m away
- 8925 Anderson Mill RdJun 9, 20258925 anderson mill rd - sign c4 · 261 m away
- 12613 Turtle Rock RdSep 16, 2026Express: remove wall panels inside the kitchen and bath areas of the duplex to perform mold remediation then install new sidings in kitchen and baths. remove air condition ducts and replace them. revision-plumbing and electrical work for mold remediation repair · 279 m away