7201 S Ute Trl
Austin, TX 78729
7201 S Ute Trl: 1 project on record
City of Austin lists 1 filing across 1 project at 7201 S Ute Trl, Austin, TX 78729. The most recent, filed September 2, 2025, covers: “Abandon septic and connect to city sewer tap”.
Compiled from City of Austin records · updated Sep 2, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Sep 2, 2025
- since Sep 2, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledAbandon septic and connect to city sewer tap
- AppliedAug 26, 2025
- IssuedSep 2, 2025
- WorkSep '25 – Apr '26
- Final inspectionApr 14, 2026
Passed final inspection Apr 14, 2026.
1 contact on this project · 1 phone number
Permit & project history
1 projectAbandon septic and connect to city sewer tap
Abandon septic and connect to city sewer tap
City of Austin permitPlumbing PermitFinal- Record
- 2025-108055 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 7201 S Ute Trl
What is being built at 7201 S Ute Trl?
The latest filing (City of Austin permit 2025-108055 PP, September 2, 2025) covers abandon septic and connect to city sewer tap.
How many permits and filings does 7201 S Ute Trl have?
1 filing across 1 project, from September 2, 2025 to September 2, 2025.
Is there other construction near 7201 S Ute Trl?
Yes. Nearby filings include 7203 S Ute Trl (replacement of an existing water heater replace 40-gallon electric water heater location: garage, Jul 8, 2026); 7205 S Ute Trl (replace meter base and main panel (200 amp overhead), Feb 16, 2024); 7200 S Ute Trl (replacement of an existing water heater replace 50 gallon electric water heater, Feb 13, 2026).
How do I get alerts for new permits at 7201 S Ute Trl?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78729- 7203 S Ute TrlJul 8, 2026Replacement of an existing water heater replace 40-gallon electric water heater location: garage · 21 m away
- 7205 S Ute TrlFeb 16, 2024Replace meter base and main panel (200 amp overhead) · 46 m away
- 7200 S Ute TrlFeb 13, 2026Replacement of an existing water heater replace 50 gallon electric water heater · 48 m away
- 7102 N Sioux TrlJan 16, 2026Replacement of an existing water heater install a 50gal electric water heater · 52 m away
- 12703 Blackfoot TrlAug 10, 2026Replacement of complete existing central heat and air system with or without duct work · 55 m away
- 7106 S Ute TrlJan 22, 2024Amnesty co for existing two story single-family residence circa 1974 · 90 m away
- 7300 S Ute TrlJan 3, 2024Replacement of an existing water heater · 106 m away
- 7202 N Ute TrlMar 27, 2024New sprinkler system installation in the front and back yard · 151 m away
- 7307 S Ute TrlJan 30, 2026Replacement of complete existing central heat and air system with or without duct work like for like: 3 ton horizontal heat pump system · 156 m away
- 7101 N Ute TrlNov 27, 2025New in-ground pool (no spa or heater) · 174 m away
- 7104 N Ute TrlJun 16, 2025Replace old 200amps service with a new 200amps service · 181 m away
- 7009 S Sioux TrlJun 17, 2024Express: replace tub/ shower with acrylic shower base and walls replace vales and fixtures · 199 m away