7404 Tovar Dr
Austin, TX 78729
7.11-kW rooftop solar system permitted at Austin home
Austin permits indicate a new 7.11-kW rooftop solar system for an existing residence at 7404 Tovar Dr. The solar electrical permit was filed September 25, 2025; a later permit filed October 24 covers disconnecting and replacing the wire between the revenue meter and main service panel, without replacing the meter. Both permits are listed as final.
Summarized from City of Austin records · updated Oct 24, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Oct 24, 2025
- since Sep 25, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledRequest to disconnect replacing wire running from the revenue meter to the main service panel. not replacing the revenue meter
- AppliedOct 18, 2025
- IssuedOct 24, 2025
- WorkOct '25 – Dec '25
- Final inspectionDec 22, 2025
Passed final inspection Dec 22, 2025.
1 contact on this project · 1 phone number
Permit & project history
2 projectsRequest to disconnect replacing wire running from the revenue meter to the main service panel. not replacing the revenue meter
Request to disconnect replacing wire running from the revenue meter to the main service panel. not replacing the revenue meter
City of Austin permitElectrical PermitFinal- Record
- 2025-135268 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Install new 7.11 kw rooftop solar system to existing residential only using a backfed breaker
Install new 7.11 kw rooftop solar system to existing residential only using a backfed breaker
City of Austin permitElectrical PermitFinal- Record
- 2025-118289 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 7404 Tovar Dr
What is being built at 7404 Tovar Dr in Austin?
A City of Austin permit filed September 25, 2025, describes a new 7.11-kW rooftop solar system for an existing residence.
Is 7404 Tovar Dr getting rooftop solar?
Yes. Electrical Permit 2025-118289 EP describes installation of a 7.11-kW rooftop solar system using a backfed breaker.
When was the solar permit filed for 7404 Tovar Dr?
The City of Austin filed the solar electrical permit on September 25, 2025. Permit 2025-118289 EP is listed as final.
What electrical work is planned at 7404 Tovar Dr?
A second permit, 2025-135268 EP, filed October 24, 2025, covers disconnecting and replacing the wire from the revenue meter to the main service panel. The permit says the revenue meter will not be replaced.
Are the permits for 7404 Tovar Dr final?
Both City of Austin electrical permits—2025-118289 EP and 2025-135268 EP—are listed with final status.
Also being built nearby
All of 78729- 7400 Peabody DrOct 2, 2007Milwood sec 34 — milwood section thirty four · 81 m away
- 13416 Rossello DrJan 29, 2024Replace 200a ug service to include meter can and new panel · 175 m away
- 13305 Marrero DrMar 26, 2025*emergency* install/replace 150 amp main breaker panel and meter can (underground) · 192 m away
- 13218 Greybull TrlDec 20, 2023Installing 200 amp 240 volt main service · 205 m away
- 13205 Vendrell DrJan 15, 2026100 to 200 amp meter and panel upgrade with grounding [etj] · 237 m away
- 13204 Vendrell DrMar 12, 2026Replacement of an existing water heater · 275 m away
- 13210 Greybull TrlSep 9, 2024Upgrading existing overhead service to 200 amp service not moving location of service customer wants capacity increased and equipment updated to code · 278 m away
- 7412 Napier TrlJun 1, 2026Upgrade panel · 281 m away
- 13417 Tossa LnDec 7, 2023Installation of 14 roof mounted 5.0kw ac pv modules with main panel upgrade · 283 m away
- 13261 Kerrville FolkwayApr 18, 2025We will need disconnect/reconnect as part of a pv inspection. installation of a 9.020 kw dc | 7.600 kw ac roof mount pv system · 317 m away
- 13303 Tamayo DrDec 10, 2024Etj - upgrade meter loop to 200 amp including meter socket & riser. replace main panel with like for like · 330 m away
- 7209 Parmer LnMar 2, 2007Rattan creek lift station · 337 m away
More solar installs in 78729.