8109 Elkhorn Mountain Trl
Austin, TX 78729
Home system upgrades at 8109 Elkhorn Mountain Trl
City of Austin permits show home repairs and system upgrades at 8109 Elkhorn Mountain Trl, including irrigation work, an EV charger, and HVAC and siding replacements. The first listed permit was filed June 25, 2025, and the latest was filed November 4, 2026, for new irrigation with a rain sensor.
Summarized from City of Austin records · updated Nov 4, 2026
- Projects
- 7
- 7 filings
- Latest filing
- Nov 4, 2026
- since Jun 25, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
Permit active · work underwayNew irrigation with dc and rain sensor
- AppliedOct 28, 2026
- IssuedNov 4, 2026
- WorkNov '26 – May '27
- Final inspection
Permit & project history
7 projectsNew irrigation with dc and rain sensor
New irrigation with dc and rain sensor
City of Austin permitPlumbing PermitActive- Record
- 2026-142822 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Installing an ev charger
Installing an ev charger
City of Austin permitElectrical PermitFinal- Record
- 2026-030071 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replacement of mini-split system
Replacement of mini-split system
City of Austin permitMechanical PermitFinal- Record
- 2025-122397 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Remove and replace the siding like for like harbison electric will be doing the electrical work
Remove and replace the siding like for like harbison electric will be doing the electrical work
City of Austin permitElectrical PermitFinal- Record
- 2025-107751 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replacement of complete existing central heat and air system with or without duct work replacing 4 ton gas system 2.5 ton gas system and ductwork for both systems
Replacement of complete existing central heat and air system with or without duct work replacing 4 ton gas system 2.5 ton gas system and ductwork for both systems
City of Austin permitMechanical PermitFinal- Record
- 2025-110061 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Remove and replace the siding like for like harbison electric will be doing the electrical work
Remove and replace the siding like for like harbison electric will be doing the electrical work
City of Austin permitBuilding PermitFinal- Record
- 2025-107751 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replace 3/4 or 1 prv difficult access [pressure reducing valve] replace 3/4 brass emergency water shut-off valve level 1 [pressure reducing valve]
Replace 3/4 or 1 prv difficult access [pressure reducing valve] replace 3/4 brass emergency water shut-off valve level 1 [pressure reducing valve]
City of Austin permitPlumbing PermitFinal- Record
- 2025-078047 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 8109 Elkhorn Mountain Trl
What is being built at 8109 Elkhorn Mountain Trl?
The listed permits describe home repairs and system upgrades, not a new building. Work includes irrigation, an EV charger, HVAC replacements, and siding replacement.
When were permits filed for 8109 Elkhorn Mountain Trl?
The listed City of Austin permits span June 25, 2025, through November 4, 2026. The latest, permit 2026-142822 PP, covers new irrigation with a rain sensor.
Is a new home being built at 8109 Elkhorn Mountain Trl?
The records provided do not indicate new home construction. They describe repairs and upgrades to an existing residence.
Is an EV charger being installed at 8109 Elkhorn Mountain Trl?
A City of Austin electrical permit describes installation of an EV charger. Permit 2026-030071 EP was filed March 16, 2026, and is listed as final.
What HVAC work is permitted at 8109 Elkhorn Mountain Trl?
Permits describe replacement of a mini-split system and replacement of the existing central heating and air systems, including ductwork. The central-system permit, 2025-110061 MP, was filed September 3, 2025.
Is the siding being replaced at 8109 Elkhorn Mountain Trl?
Yes. A building permit filed August 26, 2025, describes removing and replacing the siding like for like. Permit 2025-107751 BP is listed as final.
What is the latest permitted work at 8109 Elkhorn Mountain Trl?
The latest listed permit is 2026-142822 PP, filed November 4, 2026. It covers new irrigation with a rain sensor and is listed as active.
Also being built nearby
All of 78729- 8107 Elkhorn Mountain TrlMay 6, 2026Replacement of an existing water heater 40-gallon rheem natural gas water heater change out 8107 elkhorn mountain trail austin tx 78729 · 21 m away
- 12403 Hunters Chase DrOct 28, 2025Replacement of an existing water heater · 92 m away
- 12414 Beartrap LnDec 12, 2023Replacement of complete existing central heat and air system with or without duct work · 122 m away
- 12501 Turkey Ridge CtSep 10, 2026Addition- construction of workshop attached by a breezeway upgrading existing service · 130 m away
- 12307 Deer Falls DrJun 18, 2025Replace stop for gas stove · 140 m away
- 12508 Turkey Ridge CtDec 27, 2023Installing a dedicated gas line for a whole home standby generator · 149 m away
- 12408 Beartrap LnJul 14, 2026Replacement of an existing water heater tankless water heater replacement 12408 beartrap lane austin tx 78729 · 162 m away
- 12415 Beartrap LnAug 14, 2024Replacement of an existing water heater · 163 m away
- 8009 Elkhorn Mountain TrlFeb 19, 2026Excavate 20 tunnel to repair main drain line under house · 167 m away
- 12510 Turkey Ridge CtAug 2, 2024Install/replace (200 amp) main panel & meter base (underground) · 167 m away
- 12413 Beartrap LnNov 21, 2024Change out water heater to existing residence · 173 m away
- 12507 Turkey Ridge CtSep 13, 2024Replacement of complete existing central heat and air system with or without duct work · 177 m away