groundranger
Active · latest filing Oct 2026Residential

8902 Bridgewood Trl

Austin, TX 78729

Backup battery system and tub-to-shower conversion permitted

Austin permits indicate a backup battery system and additional meter socket are being installed at 8902 Bridgewood Trl; the electrical permit was filed October 16, 2026, and is active. Building and plumbing permits filed November 10 and 11, 2025, cover replacing a tub with a shower in the same footprint without moving plumbing.

Summarized from City of Austin records · updated Oct 16, 2026

Projects
3
3 filings
Latest filing
Oct 16, 2026
since Nov 10, 2025
Largest scope
—
Listed value
—

Where this project stands

Permit active · work underway

Base: installing a backup battery system and additional meter socket

  1. AppliedOct 8, 2026
  2. IssuedOct 16, 2026
  3. WorkOct '26 – Apr '27
  4. Final inspection
19% through of the permit windowOct 16, 2026 → Apr 14, 2027

1 contact on this project · 1 phone number

Permit & project history

3 projects
  1. Base: installing a backup battery system and additional meter socket

    Base: installing a backup battery system and additional meter socket

    City of Austin permitElectrical PermitActive
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Express: tub to shower replacement in the same footprint without moving plumbing

    Express: tub to shower replacement in the same footprint without moving plumbing

    City of Austin permitPlumbing PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  3. Express: tub to shower replacement in the same footprint without moving plumbing

    Express: tub to shower replacement in the same footprint without moving plumbing

    City of Austin permitBuilding PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 8902 Bridgewood Trl

What is being built at 8902 Bridgewood Trl?

Permits indicate a backup battery system and additional meter socket are being installed. Earlier permits cover a tub-to-shower replacement in the same footprint.

When was the backup battery permit filed at 8902 Bridgewood Trl?

The electrical permit, 2026-132909 EP, was filed October 16, 2026. Its status is Active.

Is a bathroom being remodeled at 8902 Bridgewood Trl?

Building permit 2025-144014 BP and plumbing permit 2025-144014 PP cover replacing a tub with a shower in the same footprint, without moving plumbing.

When were the tub-to-shower permits filed?

The building permit was filed November 10, 2025, and the plumbing permit was filed November 11, 2025. Both are listed as Final.

Is new construction planned at 8902 Bridgewood Trl?

The listed permits describe a backup battery system, an additional meter socket, and a tub-to-shower replacement. They do not describe new construction.

What does permit 2026-132909 EP cover in Austin?

The City of Austin electrical permit describes installing a backup battery system and additional meter socket at 8902 Bridgewood Trl. It was filed October 16, 2026, and is listed as Active.

Also being built nearby

All of 78729
Email me when it passes final inspection