10000 Cormorant Cv
Austin, TX 78730
Permits filed for an in-ground pool and spa in Austin
City of Austin permits indicate a new in-ground gunite pool and spa at 10000 Cormorant Cv. The building permit was filed March 13, 2025, followed by an electrical permit on March 31 and a plumbing permit on May 5; all three are listed as final.
Summarized from City of Austin records · updated May 5, 2025
- Projects
- 3
- 3 filings
- Latest filing
- May 5, 2025
- since Mar 13, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledNew in-ground gunite pool and spa
- AppliedJan 10, 2025
- IssuedMay 5, 2025
- WorkMay '25 – Jun '25
- Final inspectionJun 16, 2025
Passed final inspection Jun 16, 2025.
1 contact on this project
Permit & project history
3 projectsNew in-ground gunite pool and spa
New in-ground gunite pool and spa
City of Austin permitPlumbing PermitFinal- Record
- 2025-029918 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
New in-ground gunite pool and spa
New in-ground gunite pool and spa
City of Austin permitElectrical PermitFinal- Record
- 2025-029918 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
New in-ground gunite pool and spa
New in-ground gunite pool and spa
City of Austin permitBuilding PermitFinal- Record
- 2025-029918 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 10000 Cormorant Cv
What is being built at 10000 Cormorant Cv?
City of Austin permits describe a new in-ground gunite pool and spa. The records include building, electrical and plumbing permits.
When were permits filed for the pool at 10000 Cormorant Cv?
The building permit, 2025-029918 BP, was filed March 13, 2025. The electrical permit followed on March 31, and the plumbing permit was filed May 5.
Are the permits for the pool at 10000 Cormorant Cv final?
Yes. The City of Austin lists permits 2025-029918 BP, 2025-029918 EP and 2025-029918 PP as final.
Is a spa also included in the project at 10000 Cormorant Cv?
Yes. The permit descriptions specify a new in-ground gunite pool and spa.
What kind of pool is planned at 10000 Cormorant Cv?
The permit descriptions identify it as an in-ground gunite pool, with a spa.
Also being built nearby
All of 78730- 10004 Cormorant CvMar 13, 2025Replacement of an existing water heater replaced 2 ng water heaters · 28 m away
- 10001 Tideland CvJun 28, 2024Request to disconnect - replace 150-amp main breaker · 55 m away
- 9748 Big View DrApr 2, 2026Install new 3.825 kw rooftop solar system for existing residential only. existing solar · 73 m away
- 9744 Big View DrApr 21, 2025Install 20 kw kohler generator. generator will tie into existing solar transfer switch. not touching meter · 85 m away
- 10009 Cormorant CvMay 6, 2026(khan tafseer) - installation of circuit for elec. vehicle charging station - esip · 87 m away
- 9736 Big View DrAug 17, 2026Addition/remodel of new 500 square feet in current attic above garage. will rotate one existing full bathroom 90 degrees with new layout/fixtures. will add new full bath within the aforementioned 500 square foot addition above the garage. adding dormer winder as part of addition · 126 m away
- 10004 Tideland CvSep 15, 2026Install electric vehicle charger · 136 m away
- 9801 Big View DrOct 10, 2024Tunnel sewer line spot repair · 174 m away
- 10005 Inshore DrJul 21, 2025Replacement of complete existing central heat and air system with or without duct work like for like: 3 ton gas system · 178 m away
- 10016 Inshore DrAug 13, 2025Replacement of complete existing central heat and air system with or without duct work like for like: 2 ton gas system · 179 m away
- 10001 Inshore DrJul 18, 2024Install gas line from meter to generator · 178 m away
- 10013 Inshore DrJul 15, 2024Replacement of an existing water heater · 188 m away