3903 Turkey Creek Dr

Austin, TX 78730

Rooftop solar and battery storage permitted at 3903 Turkey Creek Dr

Austin permits filed October 21, 2025, indicate installation of an 11.475 kW rooftop solar system and 13.5 kW energy storage system at an existing residence. A separate permit covers disconnecting and reconnecting the service to upgrade the main distribution panel. Both permits are marked final.

Summarized from City of Austin records · updated Oct 21, 2025

Projects
2
2 filings
Latest filing
Oct 21, 2025
since Oct 21, 2025
Largest scope
—
Listed value
—

Where this project stands

Finaled

Install new 11.475 kw rooftop solar system and 13.5 kw energy storage system for existing residential only

  1. AppliedOct 15, 2025
  2. IssuedOct 21, 2025
  3. WorkOct '25 – Mar '26
  4. Final inspectionMar 23, 2026

Passed final inspection Mar 23, 2026.

1 contact on this project · 1 phone number

Permit & project history

2 projects
  1. Install new 11.475 kw rooftop solar system and 13.5 kw energy storage system for existing residential only

    Install new 11.475 kw rooftop solar system and 13.5 kw energy storage system for existing residential only

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Disconnect/reconnect to upgrade main distribution panel

    Disconnect/reconnect to upgrade main distribution panel

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 3903 Turkey Creek Dr

What is being installed at 3903 Turkey Creek Dr?

Austin permit 2025-133710 EP describes an 11.475 kW rooftop solar system and 13.5 kW energy storage system for an existing residence. It was filed October 21, 2025.

Is solar being added at 3903 Turkey Creek Dr in Austin?

Yes. Permit 2025-133710 EP indicates a new rooftop solar installation at the existing residence. The permit was filed October 21, 2025, and is marked final.

Is battery storage part of the project at 3903 Turkey Creek Dr?

Yes. The permit describes a 13.5 kW energy storage system alongside the rooftop solar system.

Are they upgrading the electrical panel at 3903 Turkey Creek Dr?

A separate Austin permit, 2025-133718 EP, covers disconnecting and reconnecting the service to upgrade the main distribution panel. It was filed October 21, 2025.

When were the permits for 3903 Turkey Creek Dr filed?

Both electrical permits were filed on October 21, 2025. Both are marked final.