6505 Bridge Point Pkwy
Austin, TX 78730
360 Lake Austin site plan filed at 6505 Bridge Point Pkwy
City of Austin records show a site plan case for 360 Lake Austin at 6505 Bridge Point Pkwy. The first case, filed September 9, 2025, was approved and released; a second case filed November 6, 2026, is awaiting an update. The records do not specify the project’s size or scope.
Summarized from City of Austin records · updated Nov 6, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Nov 6, 2026
- since Sep 9, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsSources: City of Austin
Questions about 6505 Bridge Point Pkwy
What is being built at 6505 Bridge Point Pkwy?
City of Austin records list a site plan case named 360 Lake Austin. They do not provide details about the proposed work.
Is the 360 Lake Austin project approved?
Case 12839851 was approved and released after it was filed September 9, 2025. A later case, 13535945, was filed November 6, 2026, and is awaiting an update.
When was the 360 Lake Austin site plan filed?
The first listed site plan case was filed September 9, 2025. A second case was filed November 6, 2026.
What is planned near Bridgepoint Square 1 at 6300 Bridge Point Parkway?
A site plan case named 360 Lake Austin is listed at 6505 Bridge Point Pkwy, about 55 meters from Bridgepoint Square 1. The available records do not describe the project scope.
Is construction underway at 6505 Bridge Point Pkwy?
The records provided list site plan cases, not construction activity. The latest case, filed November 6, 2026, is marked “Awaiting Update.”
Also being built nearby
All of 78730- 6507-1/2 Bridge Point PkwyJul 24, 2025Four seasons lake austin (with r sp-2021-0476d) · 48 m away
- 6300 Bridge Point Parkway · Mi Bridgepoint LLCJul 28, 2026Bridgepoint square 1 - suite 170 — renovation/alteration — renovation of existing office suite for new tenant · 55 m away
- 6300 Bridge Point Parkway · Mi Bridgepoint LLCDec 4, 2025Bridgepoint square building. 1 - suite 405 — renovation/alteration — renovation of existing tenant suite with new finishes · 55 m away
- 6504 Bridge Point PkwyMay 30, 2024Addition of power distribution to 3 areas of tenant space totaling 4855 sq ft no change to egress occupancy or use · 81 m away
- 6509-1/2 Bridge Point PkwyFeb 28, 2025Four season lake austin tree clearing · 98 m away
- 6300 Bridge Point PkwyNov 4, 2026Interior remodel - existing office space demolition finishes and mep as shown on the plans · 215 m away
- 6200 Bridgepoint Parkway · Mi Bridgepoint LLCSep 17, 2026Bridgepoint square 4 level 3 - suite 310 & 320 — renovation/alteration — renovation of existing office suites and corridor for new tenant suites · 300 m away
- 6200 Bridgepoint Parkway Level 3 · Mi Bridgepoint LLCJun 24, 2026Bridgepoint square 4 - level 3 restroom renovations — renovation/alteration — renovation of existing building level 3 restrooms · 300 m away
- 6200 Bridge Point PkwyNov 5, 2026Interior non-structural · 352 m away
- 6309 West Courtyard DrNov 5, 2024Install new 5.95kw rooftop solar system and 13.5kw battery storage system for existing residential only · 365 m away
- 6605 West Courtyard DrSep 1, 2026Adding a solar pv rooftop system to an existing residence · 367 m away
- 6307 West Courtyard DrOct 13, 2026New pool and spa · 373 m away