7624 Oak Shores
Austin, TX 78730
7624 Oak Shores: 2 projects on record
City of Austin lists 2 filings across 2 projects at 7624 Oak Shores, Austin, TX 78730 since July 10, 2007. The most recent, filed September 16, 2008, covers: “Greenshores water treatment facility”.
Compiled from City of Austin records · updated Sep 16, 2008
- Projects
- 2
- 2 filings
- Latest filing
- Sep 16, 2008
- since Jul 10, 2007
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsSources: City of Austin
Questions about 7624 Oak Shores
What is being built at 7624 Oak Shores?
The latest filing (City of Austin case 10069325, September 16, 2008) covers greenshores water treatment facility.
How many permits and filings does 7624 Oak Shores have?
2 filings across 2 projects, from July 10, 2007 to September 16, 2008.
Is there other construction near 7624 Oak Shores?
Yes. Nearby filings include 7701 Lazy River Cv (replacement of complete existing central heat and air system with or without duct work 2.5 ton horiz heatpump, Dec 6, 2024); 7800 Lazy River Cv (new in-ground pool concrete decking and equipment pad, May 19, 2026); 7601 Lazy River Cv (base: installing a backup battery system and additional meter socket, Nov 17, 2026).
How do I get alerts for new permits at 7624 Oak Shores?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78730- 7701 Lazy River CvDec 6, 2024Replacement of complete existing central heat and air system with or without duct work 2.5 ton horiz heatpump · 74 m away
- 7800 Lazy River CvMay 19, 2026New in-ground pool concrete decking and equipment pad · 226 m away
- 7601 Lazy River CvNov 17, 2026Base: installing a backup battery system and additional meter socket · 246 m away
- 3320 Pearce RdOct 20, 2026Replacement of complete existing central heat and air system with or without duct work · 274 m away
- 3316 Pearce RdDec 24, 2025Pre plumbed water softener install · 296 m away
- 7416 Oak ShoresNov 6, 2026Base: installing a backup battery system and additional meter socket · 402 m away
- 7404 Turnbuoy DrMar 30, 2026Replacement of complete existing central heat and air system with or without duct work like for like: 4 ton two stage horizontal gas system like for like: 5 ton two stage horizontal gas system **two system change out · 439 m away
- 7412 Turnbuoy DrAug 12, 2025Replacement of complete existing central heat and air system with or without duct work · 451 m away
- 7316 Turnbuoy DrApr 30, 2026Installation of a 200a service-rated automatic transfer switch 28kw whole home generator additional grounding and type 2 surge protection · 467 m away
- 7416 Turnbuoy DrMay 29, 2025Replacement of mini-split system · 476 m away
- 3700 Pappys WayAug 18, 2026Base: installing a backup battery system and additional meter socket · 489 m away
- 7309 Turnbuoy DrDec 28, 2023Replacement of complete existing central heat and air system with or without duct work · 494 m away