9623 Woody Ridge Vw
Austin, TX 78730
9623 Woody Ridge Vw: 1 project on record
City of Austin lists 1 filing across 1 project at 9623 Woody Ridge Vw, Austin, TX 78730. The most recent, filed January 30, 2024, covers: “Replacement of an existing water heater”.
Compiled from City of Austin records · updated Jan 30, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Jan 30, 2024
- since Jan 30, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of an existing water heater
- AppliedJan 26, 2024
- IssuedJan 30, 2024
- WorkJan '24 – Feb '24
- Final inspectionFeb 7, 2024
Passed final inspection Feb 7, 2024.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplacement of an existing water heater
Replacement of an existing water heater
City of Austin permitPlumbing PermitFinal- Record
- 2024-010503 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 9623 Woody Ridge Vw
What is being built at 9623 Woody Ridge Vw?
The latest filing (City of Austin permit 2024-010503 PP, January 30, 2024) covers replacement of an existing water heater.
How many permits and filings does 9623 Woody Ridge Vw have?
1 filing across 1 project, from January 30, 2024 to January 30, 2024.
Is there other construction near 9623 Woody Ridge Vw?
Yes. Nearby filings include 9711 Woody Ridge Vw (replacement of complete existing central heat and air system with or without duct work, Sep 8, 2026); 4701 High Gate Dr (replacement of 2 existing 50 gallon natural gas water heaters, Jul 10, 2024); 4900 Elizabeth Jane Ct (replacement of complete existing central heat and air system with or without duct work elizabeth revere: replacement of 5t horizontal like-for-like gas system, Nov 17, 2025).
How do I get alerts for new permits at 9623 Woody Ridge Vw?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78730- 9711 Woody Ridge VwSep 8, 2026Replacement of complete existing central heat and air system with or without duct work · 125 m away
- 4701 High Gate DrJul 10, 2024Replacement of 2 existing 50 gallon natural gas water heaters · 131 m away
- 4900 Elizabeth Jane CtNov 17, 2025Replacement of complete existing central heat and air system with or without duct work elizabeth revere: replacement of 5t horizontal like-for-like gas system · 145 m away
- 9624 Woody Ridge VwOct 27, 2026Gas line repair repair is approx. 45 feet of 1-1/4 pipe from the house to the location of the gas meter. gas leak on the main line in the ground to be rerouted · 156 m away
- 4525 Court Of St JamesFeb 17, 2026Run 1.25 - 20 mounted black iron pipe 30 trenched poly to generator · 198 m away
- 4610 High Gate DrJan 20, 2025Install new gas line for generator · 221 m away
- 4700 High Gate DrJan 3, 2026New pool and spa · 229 m away
- 9515 Prince WilliamNov 14, 2026Base: installing a backup battery system and additional meter socket · 273 m away
- 4518 Court Of St JamesJun 6, 2025Replacement of complete existing central heat and air system with or without duct work · 275 m away
- 9506 Woody Ridge VwJul 24, 2025Installation of 1 ev charger & shutdown needed for gateway install · 323 m away
- 4908 High Gate DrNov 11, 2024Replacement of complete existing central heat and air system with or without duct work 4 ton horiz gs gas with extras · 332 m away
- 4511 Whitehall CvMay 7, 2025Replacement of complete existing central heat and air system with or without duct work · 344 m away