groundranger
Recent · latest filing Jul 2025Residential

9909 Turman Cv

Austin, TX 78730

9909 Turman Cv: 3 projects on record

City of Austin lists 3 filings across 3 projects at 9909 Turman Cv, Austin, TX 78730 since April 10, 2024. The most recent, filed July 11, 2025, covers: “New gas work for generator installation”.

Compiled from City of Austin records · updated Jul 11, 2025

Projects
3
3 filings
Latest filing
Jul 11, 2025
since Apr 10, 2024
Largest scope
—
Listed value
—

Where this project stands

Finaled

New gas work for generator installation

  1. AppliedJul 8, 2025
  2. IssuedJul 11, 2025
  3. WorkJul '25 – Mar '26
  4. Final inspectionMar 13, 2026

Passed final inspection Mar 13, 2026.

1 contact on this project · 1 phone number

Permit & project history

3 projects
  1. New gas work for generator installation

    New gas work for generator installation

    City of Austin permitPlumbing PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Replacement of complete existing central heat and air system with or without duct work installing a new runtru by trane gas system 2.5 ton horizontal on this house. indoor equipment is located in the upstairs attic and the outdoor unit is on the left side of the house and its the old carrier unit 2.5 ton. -new pad -new disconnect box with e

    Replacement of complete existing central heat and air system with or without duct work installing a new runtru by trane gas system 2.5 ton horizontal on this house. indoor equipment is located in the upstairs attic and the outdoor unit is on the left side of the house and its the old carrier unit 2.5 ton. -new pad -new disconnect box with e

    City of Austin permitMechanical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  3. Installing transfer switch for future generator. no meter work required

    Installing transfer switch for future generator. no meter work required

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 9909 Turman Cv

What is being built at 9909 Turman Cv?

The latest filing (City of Austin permit 2025-084168 PP, July 11, 2025) covers new gas work for generator installation.

How many permits and filings does 9909 Turman Cv have?

3 filings across 3 projects, from April 10, 2024 to July 11, 2025.

Is there other construction near 9909 Turman Cv?

Yes. Nearby filings include 5116 China Garden Dr (install circuit for level 2 evse, Oct 9, 2025); 5124 China Garden Dr (replacement of complete existing central heat and air system with or without duct work, Jun 6, 2024); 9818 Drip Rock Ln (replace main water line from meter to home, Sep 16, 2024).

How do I get alerts for new permits at 9909 Turman Cv?

Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.

Also being built nearby

All of 78730
Email me when a new permit is filed