2200 W 35th St
Austin, TX 78731
Solar array and EV charging electrical work at 2200 W 35th St
Austin permits indicate a ground-mounted solar array and electrical work for an EV charging station at 2200 W 35th St. The solar permit was filed September 18, 2024, and the permit for a new 200-amp riser was filed October 3, 2024; both are marked final.
Summarized from City of Austin records · updated Oct 3, 2024
- Projects
- 2
- 2 filings
- Latest filing
- Oct 3, 2024
- since Sep 18, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledNew 200 amp riser for ev charging station building 36
- AppliedSep 27, 2024
- IssuedOct 3, 2024
- WorkOct '24 – Oct '24
- Final inspectionJul 13, 2026
Passed final inspection Jul 13, 2026.
1 contact on this project · 1 phone number
Permit & project history
2 projectsNew 200 amp riser for ev charging station building 36
New 200 amp riser for ev charging station building 36
City of Austin permitElectrical PermitFinal- Record
- 2024-131086 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Install commission and interconnect a grid-tied ground mounted fixed tilt solar pv array
Install commission and interconnect a grid-tied ground mounted fixed tilt solar pv array
City of Austin permitElectrical PermitFinal- Record
- 2024-090572 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 2200 W 35th St
What is being built at 2200 W 35th St in Austin?
City of Austin permits describe a grid-tied, ground-mounted solar PV array and a new 200-amp riser for an EV charging station. Both electrical permits are marked final.
Is a solar array being installed at 2200 W 35th St?
A City of Austin permit filed September 18, 2024, covers installation, commissioning, and interconnection of a grid-tied, ground-mounted solar PV array. Permit 2024-090572 EP is marked final.
Is there an EV charging station planned at 2200 W 35th St?
A City of Austin permit filed October 3, 2024, describes a new 200-amp riser for an EV charging station. Permit 2024-131086 EP is marked final.
When were permits filed for work at 2200 W 35th St?
The solar array permit was filed September 18, 2024, and the EV charging station electrical permit was filed October 3, 2024.
What is being built near Texas Health & Human Services on W 35th Street?
At 2200 W 35th St, permits indicate a ground-mounted solar PV array and electrical work for an EV charging station. Texas Health & Human Services is listed at 2203 W 35th Street, about 44 meters away.
Also being built nearby
All of 78731- 2200 W 35th St · Texas Military DepartmentOct 13, 2026Texas military department camp mabry building 8 jfhq mm — new construction — sq ft: 145,000; two stories; major maintenance design of civil, architectural, structural, mep and data/security/av for the jfhq building at camp mabry · 31 m away
- 2203 W 35th Street · Texas Health & Human ServicesJul 16, 2024Texas health and human services | welcome center — new construction — +/- 4,000 sq ft (160 sq ft pre-fabricated shack) · 44 m away
- 2203 West 35th St · State Of TexasJun 22, 2026Austin sslc replacement kitchen building — new construction — new construction of approximately 9,600 square feet for a central kitchen facility for the austin sslc campus · 44 m away
- 2510 W 35th StJan 9, 2025Replacement of an existing water heater · 230 m away
- 2600 W 35th StOct 23, 2025Interior remodel and garage conversion remodel of an existing 3 bed 3.5 bath and converting it to a 3 bed 3 bath townhome. includes rework of the existing courtyard walls replacement of partial roof as required due to damaged and replacement of existing siding. enclosing and conditioning 30 sq ft of existing garage · 240 m away
- 3302 Funston StDec 27, 2024Replacement of complete existing central heat and air system with or without duct work 1 system 4 ton electric heat pump · 342 m away
- 3402 Exposition BlvdJan 27, 2025Replacement of an existing water heater replace tankless water heater. like for like · 348 m away
- 1912 W 35th StOct 8, 2026Upgrade main service to 350amps · 355 m away
- 2700 W 35th StJul 24, 2026Replacement of complete existing central heat and air system with or without duct work replace existing 3-ton horizontal split system with like-for-like capacity · 358 m away
- 3215 Exposition BlvdAug 7, 2015Exposition multifamily · 360 m away
- 1914 W 36th StJul 24, 2026Install irrigation system · 365 m away
- 3300 Exposition BlvdApr 7, 2026Replace g water heater with power vent run new vent from closet-beneath deck and up soffit · 366 m away
More solar installs in 78731.