2644 W 45th St
Austin, TX 78731
Home repairs permitted after vehicle crash
A City of Austin permit filed January 21, 2026, covers repairs to the home after a vehicle crash. The permit says no electrical or plumbing work is needed and is listed as final.
Summarized from City of Austin records · updated Jan 21, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Jan 21, 2026
- since Jan 21, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledExpress- drunk driver ran into home. repair damages. see photos and police report. no electrical or plumbing needed
- AppliedJan 16, 2026
- IssuedJan 21, 2026
- WorkJan '26 – Jun '26
- Final inspectionJun 12, 2026
Passed final inspection Jun 12, 2026.
2 contacts on this project · 2 phone numbers
Permit & project history
1 projectExpress- drunk driver ran into home. repair damages. see photos and police report. no electrical or plumbing needed
Express- drunk driver ran into home. repair damages. see photos and police report. no electrical or plumbing needed
City of Austin permitBuilding PermitFinal- Record
- 2026-006343 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 2644 W 45th St
What is happening at 2644 W 45th St in Austin?
A City of Austin building permit covers repairs to the home after a vehicle crash. The permit was filed January 21, 2026.
Is a new home being built at 2644 W 45th St?
The permit describes repairs to an existing home, not new construction.
What work does the permit at 2644 W 45th St cover?
The permit describes repairs for damage after a vehicle ran into the home. It says no electrical or plumbing work is needed.
When was the 2644 W 45th St repair permit filed?
The City of Austin filed permit 2026-006343 BP on January 21, 2026.
Is the permit for 2644 W 45th St final?
Yes. City of Austin records list permit 2026-006343 BP as final.
Also being built nearby
All of 78731- 2645 W 45th StSep 10, 2025Install ev car charger · 43 m away
- 4517 Bull Creek RdSep 11, 2025Replacement of complete existing central heat and air system with or without duct work · 51 m away
- 4515 Bull Creek RdApr 30, 2025Express: kitchen and bathroom remodel maintaining existing layouts replace windows upgrade electrical install new siding replace drywall and insulation replace roof shingles · 52 m away
- 4507 Bull Creek RdJul 22, 2024Install irrigation system · 55 m away
- 4506 Finley DrMar 31, 2026New construction single family residential 2-story 4 bedroom 3 bath with habitable attic attached 1-car carport attached 1-car garage covered front wood deck/ porch and covered rear patio · 60 m away
- 4516 Bull Creek RdJul 2, 2025Replace sanitary sewer line replace waterline and gas line underneath house · 64 m away
- 4502 Bull Creek RdApr 10, 2024New construction single family residential 2-story 3 bedroom 2.5 bath with attached 2-car garage covered front porch covered rear patio and 2nnd story balcony · 69 m away
- 4508 Finley DrOct 1, 2025Install irrigation system · 80 m away
- 2801 W 45th StDec 12, 2023Replace wastewater line · 103 m away
- 2637 W 45th StAug 1, 2025Installation of a 9.43 kw solar panel system with 23 roof-mounted solar panles · 105 m away
- 2802 W 45th StApr 27, 2026Replacement of complete existing central heat and air system with or without duct work · 105 m away
- 4509 Finley DrSep 21, 2026Expose waste piping below the slab with a 12 tunnel to repair broken pvc under guest bathroom. one access tunnel is needed · 110 m away