3415 Ledgestone Dr
Austin, TX 78731
3415 Ledgestone Dr: 1 project on record
City of Austin lists 1 filing across 1 project at 3415 Ledgestone Dr, Austin, TX 78731. The most recent, filed November 15, 2023, covers: “Replacement of complete existing central heat and air system with or without duct work”.
Compiled from City of Austin records · updated Nov 15, 2023
- Projects
- 1
- 1 filings
- Latest filing
- Nov 15, 2023
- since Nov 15, 2023
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of complete existing central heat and air system with or without duct work
- AppliedNov 10, 2023
- IssuedNov 15, 2023
- WorkNov '23 – Jan '24
- Final inspectionJan 31, 2024
Passed final inspection Jan 31, 2024.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitFinal- Record
- 2023-146350 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 3415 Ledgestone Dr
What is being built at 3415 Ledgestone Dr?
The latest filing (City of Austin permit 2023-146350 MP, November 15, 2023) covers replacement of complete existing central heat and air system with or without duct work.
How many permits and filings does 3415 Ledgestone Dr have?
1 filing across 1 project, from November 15, 2023 to November 15, 2023.
Is there other construction near 3415 Ledgestone Dr?
Yes. Nearby filings include 3502 Mount Barker Dr (replacement of an existing water heater 50gal gas tank, Jul 23, 2025); 3500 Mount Barker Dr (installation of new 13.5kw energy storage system and 200amp span smart panel, Sep 25, 2024); 3424 Mount Barker Dr (remodel existing interior res only 9/15/25 inspector: conduct a life safety inspection of home to final this permit. sc 2150 sq ft, Oct 8, 2025).
How do I get alerts for new permits at 3415 Ledgestone Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78731- 3502 Mount Barker DrJul 23, 2025Replacement of an existing water heater 50gal gas tank · 34 m away
- 3500 Mount Barker DrSep 25, 2024Installation of new 13.5kw energy storage system and 200amp span smart panel · 43 m away
- 3424 Mount Barker DrOct 8, 2025Remodel existing interior res only 9/15/25 inspector: conduct a life safety inspection of home to final this permit. sc 2150 sq ft · 56 m away
- 3505 Mount Barker DrOct 6, 2026Replacement of complete existing central heat and air system with or without duct work · 104 m away
- 3501 Mount Barker DrDec 23, 2024Approximately 15 of gas piping from gas meter to new whole house generator · 111 m away
- 3420 Mount Barker DrMay 20, 2026Replacement of complete existing central heat and air system with or without duct work install replacement of 2 ton ac system and ductwork · 117 m away
- 3429 Monte Vista DrOct 30, 2025Repair to broken sewerline in yard and across drive way. approximately 35ft via trenching · 123 m away
- 3408 Mountain Top CirMay 20, 2026Express: installing tesla solar roof system · 143 m away
- 3509 Mount Barker DrFeb 2, 2024Install rpz on renovated pool · 148 m away
- 3427 Monte Vista DrAug 12, 2025Replacement of mini-split system · 149 m away
- 3403 Ledgestone DrNov 17, 2025Replacement of complete existing central heat and air system with or without duct work · 164 m away
- 3416 Shinoak DrSep 16, 2025Replacement of existing wood walk way components (decking joists and wood beams) partial demolition of walkway expired bp1987-01724 has been added to the scope of work for this pr for the deck · 178 m away