3417 Mount Barker Dr
Austin, TX 78731
Cast-iron plumbing sections to be replaced with PVC
A plumbing permit indicates that rotted and collapsed cast-iron sections at 3417 Mount Barker Dr will be replaced with PVC, while remaining cast-iron sections are also being replaced. The City of Austin permit was filed August 4, 2026, and is listed as final.
Summarized from City of Austin records · updated Aug 4, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Aug 4, 2026
- since Aug 4, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacing rotted and collapsed cast iron with pvc at places that are still cast iron
- AppliedJul 31, 2026
- IssuedAug 4, 2026
- WorkAug '26 – Sep '26
- Final inspectionSep 16, 2026
Passed final inspection Sep 16, 2026.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplacing rotted and collapsed cast iron with pvc at places that are still cast iron
Replacing rotted and collapsed cast iron with pvc at places that are still cast iron
City of Austin permitPlumbing PermitFinal- Record
- 2026-099484 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 3417 Mount Barker Dr
What work is permitted at 3417 Mount Barker Dr?
A City of Austin plumbing permit describes replacing rotted and collapsed cast iron with PVC in areas where cast iron remains. The permit was filed August 4, 2026.
Is a new home being built at 3417 Mount Barker Dr?
The available record is for plumbing work, not a new-home construction permit. It describes replacing cast-iron plumbing sections with PVC.
When was the plumbing permit filed for 3417 Mount Barker Dr?
The City of Austin filed permit 2026-099484 PP on August 4, 2026.
What is the status of permit 2026-099484 PP?
The City of Austin record lists the plumbing permit as final.
Does the permit list a project cost or square footage?
No project cost or square footage is listed in the available permit record.
Also being built nearby
All of 78731- 3416 Mount Barker DrNov 4, 202570 tunnel below the foundation to replace the cast iron drain lines for both bathrooms and to the kitchen sink. 2 access holes - right and left · 44 m away
- 3415 Mount Barker DrSep 4, 2025We will route the gas line 2 inch to the pool heater and the generator about 20 feet · 44 m away
- 3405 Mountain Top CirApr 3, 2026*partial demolition* addition/interior remodel to two-story sfr 3/19/26 sm - revised ** scope is to expand the primary suite and add another laundry room. bp 2019- new detached 2-car carport bp 2019-008623 *partial demolition of front entry existing carport* remodel of existing laundry room into a pool bath convert existing unconditioned storage into a utility room office & hallway; addition of a new covered patio permit outdoor kitchen built without a permit to existing non-complying 2 story single-family residence. replace old fascia and replace old soffit with new fixtures. no new wiring · 58 m away
- 3414 Mount Barker DrApr 14, 2026Installing a dedicated gas line to generator · 60 m away
- 3420 Mount Barker DrMay 20, 2026Replacement of complete existing central heat and air system with or without duct work install replacement of 2 ton ac system and ductwork · 70 m away
- 3413 Mount Barker DrOct 21, 2026Base: installing a backup battery system and additional meter socket · 76 m away
- 3406 Monte Vista DrSep 18, 2026New 2-story single family residence 4 bed/4.5 bath attached garage carport and covered porch and patio · 88 m away
- 3410 Monte Vista DrAug 14, 2024Installing approximately 10 of gas piping from gas meter to new home generator · 88 m away
- 3412 Mount Barker DrSep 9, 2026Interior remodel of kitchen: widening an existing opening into dining room turning existing pantry into storage and reconfiguring existing bathroom. an existing bedroom closet will removed and replaced by a built-in cabinet. no changes to building footprint and no changes to roofline · 90 m away
- 3411 Mount Barker DrMay 17, 2026*partial demolition* interior remodel residential improvements including construction of a new concrete patio in the front yard and installation of three french doors in the front exterior wall 5/19/26 sm - revised ** replacing 3 windows with doors that are wider (new headers) then a 5 deep patio flatwork in front of the doors · 107 m away
- 3408 Mountain Top CirMay 20, 2026Express: installing tesla solar roof system · 109 m away
- 3402 Monte Vista DrNov 15, 2023Gas to generator · 123 m away