An Emporia smart home EV charger was installed at the residence at 3820 Ridgelea Dr. The City of Austin permit was filed August 14, 2026, for a dedicated 240-volt, 50-amp circuit serving 40-amp charging.
Summarized from City of Austin records · updated Aug 14, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Aug 14, 2026
- since Aug 14, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledInstall one customer-provided emporia smart home ev charger. install a dedicated 240v 50a branch circuit for 40a charging. route approximately 45 feet from the exterior service equipment to ev charger location in the garage
- AppliedAug 13, 2026
- IssuedAug 14, 2026
- WorkAug '26 – Aug '26
- Final inspectionAug 18, 2026
Passed final inspection Aug 18, 2026.
1 contact on this project · 1 phone number
Permit & project history
1 projectInstall one customer-provided emporia smart home ev charger. install a dedicated 240v 50a branch circuit for 40a charging. route approximately 45 feet from the exterior service equipment to ev charger location in the garage
Install one customer-provided emporia smart home ev charger. install a dedicated 240v 50a branch circuit for 40a charging. route approximately 45 feet from the exterior service equipment to ev charger location in the garage
City of Austin permitElectrical PermitFinal- Record
- 2026-105969 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 3820 Ridgelea Dr
What is being installed at 3820 Ridgelea Dr?
A customer-provided Emporia smart home EV charger was installed in the garage, according to City of Austin permit 2026-105969 EP.
When was the EV charger permit filed at 3820 Ridgelea Dr?
The City of Austin filed electrical permit 2026-105969 EP on August 14, 2026. The permit status is Final.
What electrical work did the EV charger require?
The permit describes a dedicated 240-volt, 50-amp branch circuit for 40-amp charging, routed about 45 feet from the exterior service equipment to the garage charger.
Is a new home being built at 3820 Ridgelea Dr?
The record describes an EV charger installation, not new home construction.
Which permit covers the EV charger installation at 3820 Ridgelea Dr?
City of Austin electrical permit 2026-105969 EP covers the installation. It was filed August 14, 2026, and is marked Final.
Also being built nearby
All of 78731- 3808 Ridgelea DrAug 21, 2024Replacement of complete existing central heat and air system with or without duct work · 12 m away
- 3812 Ridgelea DrAug 26, 2024Replacement of complete existing central heat and air system with or without duct work · 32 m away
- 3804 Ridgelea DrSep 20, 2024Cap off w&ww · 45 m away
- 3810 Petes PathAug 7, 2025Install evse · 49 m away
- 3814 Ridgelea DrFeb 5, 2009Ridgelea, amended plat of lots 121 - 124 — ridgelea, amended plat of lots 121 - 124 · 50 m away
- 3805 Petes PathOct 29, 2025Replacement of an existing water heater 3805 petes path condominiums amended bld 1 unt b · 55 m away
- 3803 Petes PathJul 9, 20264.32kw rooftop solar install · 60 m away
- 3802 Petes PathJun 24, 2024Replacement of any self-contained packaged units · 64 m away
- 3809 Petes PathOct 22, 2024Replacement of complete existing central heat and air system with or without duct work · 64 m away
- 3703 Lawton AveApr 8, 2026Upgrade service adu service is on main house · 92 m away
- 3701 Lawton AveDec 3, 2024Replacement of complete existing central heat and air system with or without duct work · 101 m away
- 3900 Jefferson StNov 18, 2024Temp power [t-pole] 2024-067626 bp · 113 m away