3919 Knollwood Dr
Austin, TX 78731
3919 Knollwood Dr: 2 projects on record
City of Austin lists 2 filings across 2 projects at 3919 Knollwood Dr, Austin, TX 78731 since October 4, 2024. The most recent, filed April 4, 2025, covers: “Replacement of complete existing central heat and air system with or without duct work”.
Compiled from City of Austin records · updated Apr 4, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Apr 4, 2025
- since Oct 4, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of complete existing central heat and air system with or without duct work
- AppliedMar 31, 2025
- IssuedApr 4, 2025
- WorkApr '25 – May '25
- Final inspectionMay 1, 2025
Passed final inspection May 1, 2025.
1 contact on this project
Permit & project history
2 projectsReplacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitFinal- Record
- 2025-038351 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitFinal- Record
- 2024-132301 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 3919 Knollwood Dr
What is being built at 3919 Knollwood Dr?
The latest filing (City of Austin permit 2025-038351 MP, April 4, 2025) covers replacement of complete existing central heat and air system with or without duct work.
How many permits and filings does 3919 Knollwood Dr have?
2 filings across 2 projects, from October 4, 2024 to April 4, 2025.
Is there other construction near 3919 Knollwood Dr?
Yes. Nearby filings include 6602 Knollwood Cv (interior remodel, Dec 27, 2024); 3921 Knollwood Dr (replacement of complete existing central heat and air system with or without duct work, Apr 14, 2025); 3920 Sierra Dr (new in ground pool spa and concrete deck, Apr 16, 2024).
How do I get alerts for new permits at 3919 Knollwood Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78731- 6602 Knollwood CvDec 27, 2024Interior remodel · 32 m away
- 3921 Knollwood DrApr 14, 2025Replacement of complete existing central heat and air system with or without duct work · 38 m away
- 3920 Sierra DrApr 16, 2024New in ground pool spa and concrete deck · 82 m away
- 3922 Sierra DrNov 4, 2025Replacement of complete existing central heat and air system with or without duct work 3 ton 16 seer gas; 2 ton 14 seer gas · 83 m away
- 3916 Knollwood DrAug 24, 2026New pool and spa · 85 m away
- 3926 Knollwood DrAug 11, 2025***timed virtual inspection: 01/26/2025 @ 9 am*** replacement of complete existing central heat and air system with or without duct work hvac change out: 3 ton vertical heat pump system · 100 m away
- 3914 Knollwood DrJan 21, 2025Request to disconnect for replacement of 200-amp main breaker panel · 111 m away
- 3926 Sierra DrDec 19, 2023Replacement of an existing water heater · 112 m away
- 3911 Rockledge DrJul 7, 2025Replacement of complete existing central heat and air system with or without duct work · 126 m away
- 3913 Rockledge DrDec 4, 2023Replace exterior main service · 127 m away
- 3914 Sierra DrOct 21, 2026Total demolition of a sfr 2602 sq ft built in 1963 ***the building shall not be demolished until after the contractor has fulfilled the neighbor notification requirements outlined in steps 5 & 6 of the demolition webpage · 129 m away
- 3921 Sierra DrDec 19, 2025*partial demolition* addition/interior remodel/partial garage conversion to two-story sfr · 132 m away