4001 Harborlight Cv

Austin, TX 78731

HVAC replacement and sewer-line repair at 4001 Harborlight Cv

Austin permits indicate work at this residential address includes a like-for-like replacement of the existing central HVAC system and a 15-foot repair to the main sewer line. The plumbing permit was filed May 13, 2026, and the mechanical permit was filed July 10, 2026; both are marked final.

Summarized from City of Austin records · updated Jul 10, 2026

Projects
2
2 filings
Latest filing
Jul 10, 2026
since May 13, 2026
Largest scope
—
Listed value
—

Where this project stands

Finaled

Replacement of complete existing central heat and air system with or without duct work like for like: 3 ton horizontal gas system

  1. AppliedJul 5, 2026
  2. IssuedJul 10, 2026
  3. WorkJul '26 – Oct '26
  4. Final inspectionOct 12, 2026

Passed final inspection Oct 12, 2026.

1 contact on this project · 1 phone number

Permit & project history

2 projects
  1. Replacement of complete existing central heat and air system with or without duct work like for like: 3 ton horizontal gas system

    Replacement of complete existing central heat and air system with or without duct work like for like: 3 ton horizontal gas system

    City of Austin permitMechanical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. This estimate is to perform a 15 foot sewer repair on the main 4 inch pvc sewer line. allstate plumbing will utilize a subcontractor to perform the excavation once the tunnel has been fully excavated our technicians will perform the repairs either the same day or following day. every 4 foot of pipe there will be hangers to help keep the pipe secured to the underside of the slab and prevent breakage or damage in the future. once the repair has been complete an inspection will need to be performed by a state verified plumbing inspector. the tunnel cannot be backfilled until the repair passes inspection. on the day of the repair our plumbers on site will perform a hydrostatic test to ensure a leak free repair. if our technicians find other areas in need of repair while underneath the home further estimates will be provided. if the excavation crew needs to perform further structural repair on the slab or runs into any unforeseen issues further estimates will be provided. allstate plumbing/excavation crew is not responsible for any landscaping

    This estimate is to perform a 15 foot sewer repair on the main 4 inch pvc sewer line. allstate plumbing will utilize a subcontractor to perform the excavation once the tunnel has been fully excavated our technicians will perform the repairs either the same day or following day. every 4 foot of pipe there will be hangers to help keep the pipe secured to the underside of the slab and prevent breakage or damage in the future. once the repair has been complete an inspection will need to be performed by a state verified plumbing inspector. the tunnel cannot be backfilled until the repair passes inspection. on the day of the repair our plumbers on site will perform a hydrostatic test to ensure a leak free repair. if our technicians find other areas in need of repair while underneath the home further estimates will be provided. if the excavation crew needs to perform further structural repair on the slab or runs into any unforeseen issues further estimates will be provided. allstate plumbing/excavation crew is not responsible for any landscaping

    City of Austin permitPlumbing PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 4001 Harborlight Cv

What work is permitted at 4001 Harborlight Cv?

Permits cover a 15-foot repair to the main 4-inch PVC sewer line and replacement of the existing central heat and air system. Both permits are marked final.

Is a new house being built at 4001 Harborlight Cv?

The records provided show a sewer-line repair and HVAC replacement, not a new-home construction permit.

What HVAC work is planned at 4001 Harborlight Cv?

A mechanical permit filed July 10, 2026, covers like-for-like replacement of the existing central heat and air system with a 3-ton horizontal gas system. Permit 2026-085677 MP is marked final.

Is the sewer line being repaired at 4001 Harborlight Cv?

Yes. Plumbing permit 2026-058769 PP, filed May 13, 2026, describes a 15-foot repair to the main 4-inch PVC sewer line. It is marked final.

When were permits filed for work at 4001 Harborlight Cv?

The sewer-repair permit was filed May 13, 2026, and the HVAC replacement permit was filed July 10, 2026. Both are marked final.