Sewer line and drain repairs at 4006 North Hills Dr
A plumbing permit covers work to replace cast-iron drain lines serving the primary and hall bathrooms at 4006 North Hills Dr. The permit was filed September 3, 2026, and describes tunneling about 50 feet under the foundation and replacing about 45 feet of sewer line to the city tap. The permit status is final.
Summarized from City of Austin records · updated Sep 3, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Sep 3, 2026
- since Sep 3, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledTunnel under foundation to replace cast iron drain lines for primary bathroom and hall bathroom only. two access holes: one on right side of home second in back left side of home. tunnel approx. 50 ft. sewer line replaced from home to city tap connection. sewer line approx. 45 ft
- AppliedSep 1, 2026
- IssuedSep 3, 2026
- WorkSep '26 – Sep '26
- Final inspectionSep 10, 2026
Passed final inspection Sep 10, 2026.
1 contact on this project · 1 phone number
Permit & project history
1 projectTunnel under foundation to replace cast iron drain lines for primary bathroom and hall bathroom only. two access holes: one on right side of home second in back left side of home. tunnel approx. 50 ft. sewer line replaced from home to city tap connection. sewer line approx. 45 ft
Tunnel under foundation to replace cast iron drain lines for primary bathroom and hall bathroom only. two access holes: one on right side of home second in back left side of home. tunnel approx. 50 ft. sewer line replaced from home to city tap connection. sewer line approx. 45 ft
City of Austin permitPlumbing PermitFinal- Record
- 2026-114457 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 4006 North Hills Dr
What is being built at 4006 North Hills Dr in Austin?
The permit describes sewer and drain line replacement at a home, not a new building. Work includes tunneling under the foundation to replace cast-iron lines serving the primary and hall bathrooms.
What work does the plumbing permit at 4006 North Hills Dr cover?
Austin permit 2026-114457 PP covers about 50 feet of tunneling under the foundation and replacement of about 45 feet of sewer line from the home to the city tap. The description specifies the primary and hall bathrooms.
When was the permit for 4006 North Hills Dr filed?
City of Austin permit 2026-114457 PP was filed September 3, 2026. Its status is listed as final.
Is a new home being built at 4006 North Hills Dr?
The permit record does not describe new home construction. It describes plumbing work to replace drain and sewer lines at the existing home.
How long is the sewer line being replaced at 4006 North Hills Dr?
The permit description says about 45 feet of sewer line will be replaced from the home to the city tap. It also describes an approximately 50-foot tunnel beneath the foundation.
Also being built nearby
All of 78731- 4008 North Hills DrMay 16, 2025Repair of damaged cast iron sewer lines not replacing the whole system at this time · 30 m away
- 4004 North Hills DrMar 11, 202522 trench to replace yard sewer · 34 m away
- 4005 Far West BlvdOct 7, 2025Install new gas line for generator · 51 m away
- 4010 North Hills DrJan 13, 2025Replacement of complete existing central heat and air system with or without duct work · 64 m away
- 7002 Edgefield DrJan 21, 2025Replacement of complete existing central heat and air system with or without duct work · 72 m away
- 4001 Far West BlvdOct 8, 2025Install new gas line for generator · 72 m away
- 4009 North Hills DrFeb 24, 2026Irrigation backflow ( dcva ) is old and gate valves do not shut causing constant leak and high water bills muddy spot in yard during construction project. need to install a new dcva 1 and test · 77 m away
- 3931 Far West BlvdJun 13, 2025***storm related-hyatt*** emergency service repair inspection has already been passed on june 9 2025 · 91 m away
- 4011 North Hills DrJun 29, 2026Digging 95 tunnel and replacing all of the horizontal and some of the vertical cast iron drain piping under the home. tying on to existing piping going up through the slab · 102 m away
- 4000 North Hills DrJul 10, 202550 tunnel below the foundation to replace the main line back bathroom and utility drain lines. access holes - right left and front · 119 m away
- 7101 Spurlock DrSep 3, 2024Replace cast iron under the foundationreplumb (1) laundry and (1) bathrooms. we will replace it with sch 40 pvc piping through tunneling · 122 m away
- 4014 North Hills DrMay 6, 2025*partial demolition* addition 1 bedroom and 1 bathroom to a single-story sfr · 123 m away