4017 Far West Blvd
Austin, TX 78731
4017 Far West Blvd: 1 project on record
City of Austin lists 1 filing across 1 project at 4017 Far West Blvd, Austin, TX 78731. The most recent, filed August 22, 2024, covers: “31 tunnel replacing cast iron sewer with pvc”.
Compiled from City of Austin records · updated Aug 22, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Aug 22, 2024
- since Aug 22, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
Finaled31 tunnel replacing cast iron sewer with pvc
- AppliedJul 22, 2024
- IssuedAug 22, 2024
- WorkAug '24 – Sep '24
- Final inspectionSep 3, 2024
Passed final inspection Sep 3, 2024.
1 contact on this project · 1 phone number
Permit & project history
1 project31 tunnel replacing cast iron sewer with pvc
31 tunnel replacing cast iron sewer with pvc
City of Austin permitPlumbing PermitFinal- Record
- 2024-090701 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 4017 Far West Blvd
What is being built at 4017 Far West Blvd?
The latest filing (City of Austin permit 2024-090701 PP, August 22, 2024) covers 31 tunnel replacing cast iron sewer with pvc.
How many permits and filings does 4017 Far West Blvd have?
1 filing across 1 project, from August 22, 2024 to August 22, 2024.
Is there other construction near 4017 Far West Blvd?
Yes. Nearby filings include 4018 North Hills Dr (replacement of complete existing central heat and air system with or without duct work, Feb 6, 2024); 4014 North Hills Dr (*partial demolition* addition 1 bedroom and 1 bathroom to a single-story sfr, May 6, 2025); 4020 Far West Blvd (replacing 20 feet of 4 inches pvc sewer line, Mar 24, 2025).
How do I get alerts for new permits at 4017 Far West Blvd?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78731- 4018 North Hills DrFeb 6, 2024Replacement of complete existing central heat and air system with or without duct work · 54 m away
- 4014 North Hills DrMay 6, 2025*partial demolition* addition 1 bedroom and 1 bathroom to a single-story sfr · 56 m away
- 4020 Far West BlvdMar 24, 2025Replacing 20 feet of 4 inches pvc sewer line · 83 m away
- 7103 Sungate DrJan 6, 2026Total demolition of detached garage 320 sq ft circa 1967 · 105 m away
- 4010 North Hills DrJan 13, 2025Replacement of complete existing central heat and air system with or without duct work · 105 m away
- 6904 Glen Ridge DrSep 4, 2026Base: installing a backup battery system and additional meter socket · 114 m away
- 7100 Spurlock DrJan 2, 2025Replacement of complete existing central heat and air system with or without duct work · 116 m away
- 4011 North Hills DrJun 29, 2026Digging 95 tunnel and replacing all of the horizontal and some of the vertical cast iron drain piping under the home. tying on to existing piping going up through the slab · 117 m away
- 7106 Sungate DrNov 21, 2025Power for ev charger · 129 m away
- 7103 Running RopeNov 6, 2025No meter needed *upgrade outdoor main electric panel to a main breaker panel · 130 m away
- 6905 Mesa DrAug 24, 202690 tunnel below the foundation to replace entire drain system. 3 access holes - left right front · 136 m away
- 4008 North Hills DrMay 16, 2025Repair of damaged cast iron sewer lines not replacing the whole system at this time · 138 m away