Drain line replacement planned beneath home
A plumbing permit filed September 29, 2026, indicates a tunnel will be dug beneath the home to replace cast-iron laundry and kitchen drain lines with Schedule 40 PVC. The work also includes locating the building sewer line and installing two-way cleanouts; the permit is marked Final.
Summarized from City of Austin records · updated Sep 29, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Sep 29, 2026
- since Sep 29, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledTunnel under home to expose and replace cast iron laundry and kitchen drain lines. we will be replacing with sch 40 pvc. also locate building sewer line to install new two way cleanouts. tunnel access located on back right side of home
- AppliedSep 22, 2026
- IssuedSep 29, 2026
- WorkSep '26 – Oct '26
- Final inspectionOct 26, 2026
Passed final inspection Oct 26, 2026.
1 contact on this project · 1 phone number
Permit & project history
1 projectTunnel under home to expose and replace cast iron laundry and kitchen drain lines. we will be replacing with sch 40 pvc. also locate building sewer line to install new two way cleanouts. tunnel access located on back right side of home
Tunnel under home to expose and replace cast iron laundry and kitchen drain lines. we will be replacing with sch 40 pvc. also locate building sewer line to install new two way cleanouts. tunnel access located on back right side of home
City of Austin permitPlumbing PermitFinal- Record
- 2026-124510 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 4107 Deepwoods Dr
What work is planned at 4107 Deepwoods Dr?
The plumbing permit describes tunneling beneath the home to replace cast-iron laundry and kitchen drain lines with Schedule 40 PVC. It also includes locating the building sewer line and installing two-way cleanouts.
When was the plumbing permit filed?
The City of Austin permit was filed September 29, 2026. Its permit number is 2026-124510 PP.
Where will the tunnel access be at 4107 Deepwoods Dr?
The permit description says tunnel access will be on the back right side of the home.
Is this a new building at 4107 Deepwoods Dr?
The permit describes plumbing work beneath an existing home, not construction of a new building.
What kind of pipes are being replaced?
The permit says cast-iron laundry and kitchen drain lines will be replaced with Schedule 40 PVC.
What is the permit status for 4107 Deepwoods Dr?
City of Austin permit 2026-124510 PP is listed with a status of Final.
Also being built nearby
All of 78731- 4109 Deepwoods DrApr 30, 2024Replacement of complete existing central heat and air system with or without duct work · 24 m away
- 4125 Honeycomb Rock CirNov 22, 2023Replacement of an existing water heater · 59 m away
- 4119 Honeycomb Rock CirNov 5, 2026Excavate beneath the foundation to access and replace approximately 35 feet of deteriorated cast iron and clay sanitary drain piping including the half-bathroom branch and connect to the existing pvc transition · 66 m away
- 4102 Deepwoods DrMay 19, 2025Installing 1 car ev charger station inside garage that includes up to 15 feet from the electrical panel. all electrical wiring included · 72 m away
- 4110 Honeycomb Rock CirOct 7, 2024Replacement of complete existing central heat and air system with or without duct work · 97 m away
- 4105 Greystone DrJul 15, 2025Express: remove and replace siding · 100 m away
- 4115 Honeycomb Rock CirSep 8, 2026Addition and remodel: full interior remodel with small interior additions on rear and new covered back porch all new interior finishes and fixtures all new exterior windows doors roofing and siding (except brick) new gas fire place decorative structural changes to front side of roof all new plumbing and electrical. pool not in scope · 116 m away
- 4201 Deepwoods DrAug 6, 2025Interior remodel of sfr · 122 m away
- 4106 Honeycomb Rock CirNov 3, 2025Request to disconnect install 150 amp ats 26 kw generator. service size to remain as existing · 134 m away
- 4104 Honeycomb Rock CirOct 10, 2025Express: replace pipe under house relocate fire place gas cut out replace hvac system with duct work replace all light fixtures relocate some light switches and add 4 floor plugs replace kitchen cabinet. re-open permit per customer additional plumbing work was done - domestic water yard line replacement replace all water supply inside house. add a water softener loop and drain. swap shower valves and move two drain locations in master bath. move log lighter key location · 135 m away
- 4113 Honeycomb Rock CirOct 1, 2024Install new gas line for generator · 140 m away