4107 Honeycomb Rock Cir
Austin, TX 78731
Austin permit records show pool demolition and plumbing work
City of Austin permits show a pool was totally demolished at 4107 Honeycomb Rock Cir on November 11, 2025. An earlier plumbing permit, filed November 11, 2024, covers tunneling under the foundation and replacing cast iron pipes at two bathrooms. Both permits are listed as final.
Summarized from City of Austin records · updated Nov 11, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Nov 11, 2025
- since Nov 11, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledTotal demolition of pool
- AppliedSep 23, 2025
- IssuedNov 11, 2025
- WorkNov '25 – Apr '26
- Final inspectionApr 20, 2026
Passed final inspection Apr 20, 2026.
2 contacts on this project · 2 phone numbers
Permit & project history
2 projectsTotal demolition of pool
Total demolition of pool
City of Austin permitBuilding PermitFinal- Record
- 2025-135028 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Tunneling under the foundation and replacing cast iron at two bathrooms using sch 40 pvc
Tunneling under the foundation and replacing cast iron at two bathrooms using sch 40 pvc
City of Austin permitPlumbing PermitFinal- Record
- 2024-147606 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 4107 Honeycomb Rock Cir
What is happening at 4107 Honeycomb Rock Cir?
City of Austin records show a permit for total pool demolition, filed November 11, 2025, and an earlier plumbing permit for work at two bathrooms.
Is a new pool being built at 4107 Honeycomb Rock Cir?
The permit record listed for this address describes total demolition of a pool, not construction of a new one.
When was the pool demolition permit filed?
The City of Austin filed permit 2025-135028 BP on November 11, 2025. Its status is listed as final.
What plumbing work was permitted at this address?
Permit 2024-147606 PP covers tunneling under the foundation and replacing cast iron pipes at two bathrooms with Schedule 40 PVC. It was filed November 11, 2024, and is listed as final.
Is a new building being constructed at 4107 Honeycomb Rock Cir?
The two City of Austin permits in the records describe pool demolition and plumbing work. They do not describe new building construction.
Also being built nearby
All of 78731- 4106 Honeycomb Rock CirNov 3, 2025Request to disconnect install 150 amp ats 26 kw generator. service size to remain as existing · 41 m away
- 4104 Honeycomb Rock CirOct 10, 2025Express: replace pipe under house relocate fire place gas cut out replace hvac system with duct work replace all light fixtures relocate some light switches and add 4 floor plugs replace kitchen cabinet. re-open permit per customer additional plumbing work was done - domestic water yard line replacement replace all water supply inside house. add a water softener loop and drain. swap shower valves and move two drain locations in master bath. move log lighter key location · 50 m away
- 4102 Cat Hollow DrNov 17, 2026New construction in-ground pool and spa · 63 m away
- 4113 Honeycomb Rock CirOct 1, 2024Install new gas line for generator · 74 m away
- 4110 Honeycomb Rock CirOct 7, 2024Replacement of complete existing central heat and air system with or without duct work · 78 m away
- 4115 Honeycomb Rock CirSep 8, 2026Addition and remodel: full interior remodel with small interior additions on rear and new covered back porch all new interior finishes and fixtures all new exterior windows doors roofing and siding (except brick) new gas fire place decorative structural changes to front side of roof all new plumbing and electrical. pool not in scope · 89 m away
- 7301 Waterline RdOct 21, 2026Base: installing a backup battery system and additional meter socket · 93 m away
- 7207 Waterline RdAug 10, 2026Express: foundation repair - install 8 push piers · 94 m away
- 4107 Cat Hollow DrDec 31, 2024Tunnel under foundation to repair drain lines located at washing machine and kitchen. we will have 2 access holes around perimeter 1 by clean out and the other on back side of house by washing machine · 94 m away
- 4103 Cat Hollow DrJan 4, 2026Tunnel under the foundation to replace the cast-iron piping in the bathroom and kitchen with sch 40 pvc. there will be (2-3) access holes on the front right and left sides of the house · 108 m away
- 7205 Waterline RdMar 11, 2024Install evse · 122 m away
- 4119 Honeycomb Rock CirNov 5, 2026Excavate beneath the foundation to access and replace approximately 35 feet of deteriorated cast iron and clay sanitary drain piping including the half-bathroom branch and connect to the existing pvc transition · 123 m away