4209 Farhills Dr
Austin, TX 78731
Drain-line replacement permitted at 4209 Farhills Dr
A permit filed February 11, 2026, covers tunneling beneath the home’s foundation to replace drain lines serving the bathrooms, kitchen and washer, plus the sewer line to the city tap. The City of Austin permit, 2026-013180 PP, describes about 145 feet of tunneling and 72 feet of sewer-line replacement.
Summarized from City of Austin records · updated Feb 11, 2026
- Projects
- 3
- 3 filings
- Latest filing
- Feb 11, 2026
- since Dec 23, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledTunnel under foundation to replace cast iron drain lines for 3 full bathrooms and a half bathroom and also including kitchen and washer drain line. total of 4 access holes will be made one in the front the second on the left side of the home the third will be made in the back by the kitchen area and the fourth will be made on the right side of the home. total length of tunnel is approximately 145 feet. sewer line will also be replaced from the home to the city tap with the length of 72 feet
- AppliedFeb 3, 2026
- IssuedFeb 11, 2026
- WorkFeb '26 – Feb '26
- Final inspectionFeb 17, 2026
Passed final inspection Feb 17, 2026.
1 contact on this project · 1 phone number
Permit & project history
3 projectsTunnel under foundation to replace cast iron drain lines for 3 full bathrooms and a half bathroom and also including kitchen and washer drain line. total of 4 access holes will be made one in the front the second on the left side of the home the third will be made in the back by the kitchen area and the fourth will be made on the right side of the home. total length of tunnel is approximately 145 feet. sewer line will also be replaced from the home to the city tap with the length of 72 feet
Tunnel under foundation to replace cast iron drain lines for 3 full bathrooms and a half bathroom and also including kitchen and washer drain line. total of 4 access holes will be made one in the front the second on the left side of the home the third will be made in the back by the kitchen area and the fourth will be made on the right side of the home. total length of tunnel is approximately 145 feet. sewer line will also be replaced from the home to the city tap with the length of 72 feet
City of Austin permitPlumbing PermitFinal- Record
- 2026-013180 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Installation of tesla powerwall 3 battery system. temporary shutdown needed
Installation of tesla powerwall 3 battery system. temporary shutdown needed
City of Austin permitElectrical PermitFinal- Record
- 2024-166806 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Installation of 6.8 kw solar system on residential roof with ess
Installation of 6.8 kw solar system on residential roof with ess
City of Austin permitElectrical PermitFinal- Record
- 2024-160958 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 4209 Farhills Dr
What work is being done at 4209 Farhills Dr?
A City of Austin plumbing permit covers replacing drain lines beneath the home’s foundation and the sewer line from the home to the city tap. The permit was filed February 11, 2026.
What does permit 2026-013180 PP cover?
Permit 2026-013180 PP covers approximately 145 feet of tunneling for drain-line replacement and 72 feet of sewer-line replacement to the city tap. Its status is listed as final.
Which parts of the home’s plumbing are included?
The permit description lists drains for three full bathrooms, one half bathroom, the kitchen and the washer.
Were solar panels or a battery system permitted at this address?
City records list a 6.8-kilowatt rooftop solar system with energy storage, permitted December 23, 2024, and a Tesla Powerwall 3 battery system, permitted January 6, 2025. Both electrical permits are listed as final.
Is a restaurant being built at 4209 Farhills Dr?
The available permit descriptions document residential plumbing and electrical work, including drain-line replacement, solar and a battery system. They do not describe construction of a restaurant.
Also being built nearby
All of 78731- 4301 Farhills DrJun 12, 2026Demolition old upper deck and rebuilding with wui approved materials adding existing unpermitted canopy roof so that it will be properly permitted · 34 m away
- 4300 Farhills DrJan 28, 2026Porch enclosure. enclosing one wall under the existing structure and roofline to bring the porch indoors. adding.5 bath. revision approved 12/15. added interior remodel to porch enclosure. roll in express permits 2023-095776 bp ep mp pp · 64 m away
- 4206 Farhills DrFeb 24, 2026Interior remodel portions of doors infilled interior non load bearing walls in master bath were removed and new walls installed load bearing wall between kitchen and family room removed and replaced (full scope of structural verification report) · 85 m away
- 4302 Farhills DrMar 20, 2026Replacement of complete existing central heat and air system with or without duct work · 96 m away
- 4211 North Hills DrJan 24, 2024Upgrade meter and 200 amp service we have to de-energize meter to be able to perform the upgrade of the service5 · 107 m away
- 4201 Farhills DrJun 2, 2026Dedicated gas to new generator · 119 m away
- 4202 Farhills DrNov 3, 2026Interior remodel- remove and replace doors and windows. remove and replace siding. relocate existing plumbing and electrical. construct new non-load bearing wall. replace all drywall in new construction areas · 137 m away
- 4111 Farhills DrJun 2, 2025Replacement of complete existing central heat and air system with or without duct work · 149 m away
- 4212 North Hills DrApr 21, 2025Replacement of complete existing central heat and air system with or without duct work · 156 m away
- 4302 North Hills DrJul 3, 2025Express - foundation repair · 162 m away
- 4210 North Hills DrApr 4, 2025Install gas pipe to generator · 163 m away
- 6903 Stahl CvNov 21, 2024Run gas line to furnace at existing residence · 166 m away