groundranger
Historic · latest filing Oct 2024Residential

4302 Greystone Dr

Austin, TX 78731

4302 Greystone Dr: 1 project on record

City of Austin lists 1 filing across 1 project at 4302 Greystone Dr, Austin, TX 78731. The most recent, filed October 9, 2024, covers: “Tunnel under the foundation and replace cast iron drain line in (2) bathroom (1) kitchen and (1) laundry with pvc”.

Compiled from City of Austin records · updated Oct 9, 2024

Projects
1
1 filings
Latest filing
Oct 9, 2024
since Oct 9, 2024
Largest scope
—
Listed value
—

Where this project stands

Finaled

Tunnel under the foundation and replace cast iron drain line in (2) bathroom (1) kitchen and (1) laundry with pvc

  1. AppliedOct 1, 2024
  2. IssuedOct 9, 2024
  3. WorkOct '24 – Oct '24
  4. Final inspectionOct 25, 2024

Passed final inspection Oct 25, 2024.

1 contact on this project · 1 phone number

Permit & project history

1 project
  1. Tunnel under the foundation and replace cast iron drain line in (2) bathroom (1) kitchen and (1) laundry with pvc

    Tunnel under the foundation and replace cast iron drain line in (2) bathroom (1) kitchen and (1) laundry with pvc

    City of Austin permitPlumbing PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 4302 Greystone Dr

What is being built at 4302 Greystone Dr?

The latest filing (City of Austin permit 2024-132978 PP, October 9, 2024) covers tunnel under the foundation and replace cast iron drain line in (2) bathroom (1) kitchen and (1) laundry with pvc.

How many permits and filings does 4302 Greystone Dr have?

1 filing across 1 project, from October 9, 2024 to October 9, 2024.

Is there other construction near 4302 Greystone Dr?

Yes. Nearby filings include 4304 Greystone Dr (new detached covered pavilion with fireplace and outdoor kitchen, Oct 16, 2025); 4303 Lostridge Dr (repair 150 foot of gas line, Apr 30, 2024); 4301 Lostridge Dr (replace underfloor cast iron waste and vent piping with new pvc piping. we will break concrete in the garage(20) tunnel (20) to the washer and bathrooms break across the driveway(25) and run to the city cleanout across the grass(40). on the left side of the house at the kitchen sink we will tie on to the piping in the wall run down to below grade outside and run across the grass and connect to our new line from the garage(right side of house), Oct 2, 2026).

How do I get alerts for new permits at 4302 Greystone Dr?

Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.

Also being built nearby

All of 78731

More restaurants in 78731.

Email me when a new permit is filed