groundranger
Historic · latest filing Nov 2023Residential

4307 Bamford Dr

Austin, TX 78731

4307 Bamford Dr: 1 project on record

City of Austin lists 1 filing across 1 project at 4307 Bamford Dr, Austin, TX 78731. The most recent, filed November 30, 2023, covers: “Complete cast iron repipe of sanitary sewer system and sewer yard line replacement”.

Compiled from City of Austin records · updated Nov 30, 2023

Projects
1
1 filings
Latest filing
Nov 30, 2023
since Nov 30, 2023
Largest scope
—
Listed value
—

Where this project stands

Finaled

Complete cast iron repipe of sanitary sewer system and sewer yard line replacement

  1. AppliedNov 8, 2023
  2. IssuedNov 30, 2023
  3. WorkNov '23 – Jan '24
  4. Final inspectionJan 3, 2024

Passed final inspection Jan 3, 2024.

1 contact on this project · 1 phone number

Permit & project history

1 project
  1. Complete cast iron repipe of sanitary sewer system and sewer yard line replacement

    Complete cast iron repipe of sanitary sewer system and sewer yard line replacement

    City of Austin permitPlumbing PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 4307 Bamford Dr

What is being built at 4307 Bamford Dr?

The latest filing (City of Austin permit 2023-145460 PP, November 30, 2023) covers complete cast iron repipe of sanitary sewer system and sewer yard line replacement.

How many permits and filings does 4307 Bamford Dr have?

1 filing across 1 project, from November 30, 2023 to November 30, 2023.

Is there other construction near 4307 Bamford Dr?

Yes. Nearby filings include 4305 Bamford Dr (tunnel spot repair tunneling approximately 25 linear feet to access existing sewer line between washing machine and kitchen connection point. removal and disposal of old/damaged drain line. installation of new 2 schedule 40 pvc sewer line with proper slope and fittings. connection to existing fixture arms, Dec 9, 2025); 4304 Lostridge Dr (new covered patio addition replace the front windows with like for like sizes r&r ac compressor and pool pumps new pool coping and synthetic grass add gas for a new pool heater and auto fill, Jul 16, 2025); 7600 West Rim Dr (in this option will be tunneling from the right side of the home all the way underneath of the house to the furthest restroom so we can uncover all plumbing that is being ran underneath the home. once the entire trunk line has been dug up we will also dig up all branch lines going to toilets lavatorys and any other drain pipes. once everything has been dug up and we have access to all plumbing we will cut off from the outside of the home and detach all plumbing from the home. we will then be running brand new pvc throughout the entire home to each existing drain line. we will also be adding hangers to all piping every 4 feet to ensure that the entire plumbing system will not be compromised if the foundation ever moves, Jul 24, 2025).

How do I get alerts for new permits at 4307 Bamford Dr?

Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.

Also being built nearby

All of 78731
Email me when a new permit is filed