4403 Jessamine Holw
Austin, TX 78731
4403 Jessamine Holw: 1 project on record
City of Austin lists 1 filing across 1 project at 4403 Jessamine Holw, Austin, TX 78731. The most recent, filed December 7, 2023, covers: “(kayne ariel) - installation of circuit for elec. vehicle charging station-esip”.
Compiled from City of Austin records · updated Dec 7, 2023
- Projects
- 1
- 1 filings
- Latest filing
- Dec 7, 2023
- since Dec 7, 2023
- Largest scope
- —
- Listed value
- —
Where this project stands
Finaled(kayne ariel) - installation of circuit for elec. vehicle charging station-esip
- AppliedDec 4, 2023
- IssuedDec 7, 2023
- WorkDec '23 – Jan '24
- Final inspectionJan 25, 2024
Passed final inspection Jan 25, 2024.
1 contact on this project · 1 phone number
Permit & project history
1 project(kayne ariel) - installation of circuit for elec. vehicle charging station-esip
(kayne ariel) - installation of circuit for elec. vehicle charging station-esip
City of Austin permitElectrical PermitFinal- Record
- 2023-154934 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 4403 Jessamine Holw
What is being built at 4403 Jessamine Holw?
The latest filing (City of Austin permit 2023-154934 EP, December 7, 2023) covers (kayne ariel) - installation of circuit for elec. vehicle charging station-esip.
How many permits and filings does 4403 Jessamine Holw have?
1 filing across 1 project, from December 7, 2023 to December 7, 2023.
Is there other construction near 4403 Jessamine Holw?
Yes. Nearby filings include 4402 Ridgeside Ct (new uncovered wood and concrete deck pool and spa, Oct 29, 2026); 4400 Ridgeside Ct (replacement of complete existing central heat and air system with or without duct work, Oct 14, 2025); 4401 Ridgeside Ct (request to disconnect we are adding a automatic transfer switch for a generator. we are needing to pull the meter, May 9, 2024).
How do I get alerts for new permits at 4403 Jessamine Holw?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78731- 4402 Ridgeside CtOct 29, 2026New uncovered wood and concrete deck pool and spa · 82 m away
- 4400 Ridgeside CtOct 14, 2025Replacement of complete existing central heat and air system with or without duct work · 83 m away
- 4401 Ridgeside CtMay 9, 2024Request to disconnect we are adding a automatic transfer switch for a generator. we are needing to pull the meter · 90 m away
- 6005 Mountain Villa DrMay 20, 2024Replacement of complete existing central heat and air system with or without duct work · 107 m away
- 6011 Mountain Villa DrOct 22, 2025New irrigation install · 108 m away
- 6103 Twin Ledge CvJul 16, 2026Replacement of complete existing central heat and air system with or without duct work · 115 m away
- 6109 Twin Ledge DrNov 12, 2025Install new 16.10 kw dc rooftop solar system and 10.0 kwh energy storage system to existing residential · 136 m away
- 5925 Mountain Villa DrMay 30, 2026Replacement of complete existing central heat and air system with or without duct work like for like: 2 ton vertical gas (downstairs) · 140 m away
- 6102 Twin Ledge CvJul 17, 2026Replacement of an existing water heater 50 gallon natural gas water heater replacement · 155 m away
- 5923 Mountain Villa DrOct 30, 2026Replacement of complete existing central heat and air system with or without duct work changing out one gas unit like for like with no duct work · 162 m away
- 4502 Knap HolwJun 12, 2024Replacement of complete existing central heat and air system with or without duct work · 167 m away
- 6107 Twin Ledge CvJun 26, 2026Retroactively permitting above-ground pool · 173 m away