4608 Oakmont Blvd
Austin, TX 78731
4608 Oakmont Blvd: 1 project on record
City of Austin lists 1 filing across 1 project at 4608 Oakmont Blvd, Austin, TX 78731. The most recent, filed February 20, 2025, covers: “Replace existing waterline 40 feet of pex pipe no tunneling no drywall repairs”.
Compiled from City of Austin records · updated Feb 20, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Feb 20, 2025
- since Feb 20, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
Permit expiredReplace existing waterline 40 feet of pex pipe no tunneling no drywall repairs
- AppliedJan 30, 2025
- IssuedFeb 20, 2025
- !WorkFeb '25 – Aug '25
- Final inspection
Marked expired Aug 21, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplace existing waterline 40 feet of pex pipe no tunneling no drywall repairs
Replace existing waterline 40 feet of pex pipe no tunneling no drywall repairs
City of Austin permitPlumbing PermitExpired- Record
- 2025-011853 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 4608 Oakmont Blvd
What is being built at 4608 Oakmont Blvd?
The latest filing (City of Austin permit 2025-011853 PP, February 20, 2025) covers replace existing waterline 40 feet of pex pipe no tunneling no drywall repairs.
How many permits and filings does 4608 Oakmont Blvd have?
1 filing across 1 project, from February 20, 2025 to February 20, 2025.
Is there other construction near 4608 Oakmont Blvd?
Yes. Nearby filings include 4609 Finley Dr (remodel and conversion to convert existing attached garage/ with interior remodel remodel throughout existing interior in tandem with garage conversion permit to primary en suite conversion of existing attached garage to convered space in tandem with interior remodel, Jun 4, 2025); 4611 Finley Dr (replacement of an existing water heater, Feb 13, 2024); 4603 Finley Dr (construct new driveway approach 12 ft. fee in lieu of sidewalk paid, Jan 22, 2025).
How do I get alerts for new permits at 4608 Oakmont Blvd?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78731- 4609 Finley DrJun 4, 2025Remodel and conversion to convert existing attached garage/ with interior remodel remodel throughout existing interior in tandem with garage conversion permit to primary en suite conversion of existing attached garage to convered space in tandem with interior remodel · 46 m away
- 4611 Finley DrFeb 13, 2024Replacement of an existing water heater · 49 m away
- 4603 Finley DrJan 22, 2025Construct new driveway approach 12 ft. fee in lieu of sidewalk paid · 77 m away
- 4615 Oakmont BlvdDec 26, 2023(fitte lauren) - installation of circuit for elec. vehicle charging station-esip · 78 m away
- 4610 Chiappero TrlMay 8, 2024Replace existing tankless water heater with the same one · 87 m away
- 4606 Finley DrNov 16, 2023Express: flood damage repairs like for like (non structural and not relocating fixtures) electrical and plumbing work · 91 m away
- 4601 Oakmont BlvdOct 7, 2024Install a full lawn sprinkler system · 91 m away
- 4508 Oakmont BlvdJan 7, 2025Covered patio and wood deck improvements. retroactive permit covered patio and wood deck. extending wood deck · 97 m away
- 4604 Chiappero TrlSep 22, 2025Service rebuild · 97 m away
- 4700 Oakmont BlvdSep 8, 2025Excavate 20 tunnel · 97 m away
- 4612 Finley DrApr 28, 2026Change out: replace 50 gallon natural gas tank type with 199k btu natural gas tank type water heater · 102 m away
- 4509 Finley DrSep 21, 2026Expose waste piping below the slab with a 12 tunnel to repair broken pvc under guest bathroom. one access tunnel is needed · 107 m away