4702 Gold Flower Holw
Austin, TX 78731
HVAC system replacement permitted at 4702 Gold Flower Holw
A replacement central heating and air conditioning system was permitted at this residential address on March 24, 2026. Austin permit 2026-033811 MP covers 3-ton and 3.5-ton AC systems, with or without ductwork.
Summarized from City of Austin records · updated Mar 24, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Mar 24, 2026
- since Mar 24, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of complete existing central heat and air system with or without duct work install 3 ton and 3.5 ton ac system
- AppliedMar 20, 2026
- IssuedMar 24, 2026
- WorkMar '26 – Apr '26
- Final inspectionApr 23, 2026
Passed final inspection Apr 23, 2026.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplacement of complete existing central heat and air system with or without duct work install 3 ton and 3.5 ton ac system
Replacement of complete existing central heat and air system with or without duct work install 3 ton and 3.5 ton ac system
City of Austin permitMechanical PermitFinal- Record
- 2026-033811 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 4702 Gold Flower Holw
What is being built at 4702 Gold Flower Holw?
The City of Austin permit indicates replacement of the existing central heating and air conditioning system, not a new building. The work covers 3-ton and 3.5-ton AC systems.
When was the HVAC replacement permitted at 4702 Gold Flower Holw?
The permit was filed on March 24, 2026. It is City of Austin permit 2026-033811 MP.
What does Austin permit 2026-033811 MP cover?
It covers replacement of the complete existing central heat and air system, with or without ductwork, and installation of 3-ton and 3.5-ton AC systems.
Is a new house being built at 4702 Gold Flower Holw?
The available permit record is for a mechanical system replacement, not new home construction.
What size air conditioning systems are listed for 4702 Gold Flower Holw?
The permit description lists 3-ton and 3.5-ton AC systems as part of the replacement work.
Also being built nearby
All of 78731- 4808 Fern HolwSep 3, 2026Replacement of an existing water heater new 50-gallon natural gas water heater change out 4808 fern hollow austin tx 78731 · 40 m away
- 5928 Lookout Mountain DrOct 3, 2024Replacement of complete existing central heat and air system with or without duct work · 47 m away
- 4805 Fern HolwJul 31, 2024Express: rear off existing tile supply and install radiant barrier decking on entire roof and shingles · 50 m away
- 5918 Lookout Mountain DrMay 30, 2025Addition/ remodel to existing 2-story single-family residential to include: adding 145 sq ft storage room on ground level adding 145 sq ft family room adding covered and uncovered exterior 2nd and 3rd floor decks. revision #1: removing existing single door in master bedroom and replacing existing windows with patio double door. relocating exterior stairs at deck area to house side · 54 m away
- 5902 Balsam HolwFeb 5, 2026Express: removing and replacing 20 windows 1 door (like for like) · 65 m away
- 4803 Fern HolwApr 13, 2026Replacement of an existing water heater change out of 50 gallon natural gas water heater with a new 50 gallon natural gas water heater in the garage · 68 m away
- 5936 Lookout Mountain DrJun 16, 2025Replacement of an existing water heater replacement of 50-gallon natural gas water heater with expansion tank installation · 74 m away
- 5902 North West PlSep 4, 2026*partial demolition* interior remodel · 83 m away
- 4801 Fern HolwDec 12, 2023Replacement of complete existing central heat and air system with or without duct work · 88 m away
- 5909 Lookout Mountain DrAug 5, 2026Replacement of an existing water heater replacing water heater with similar model · 106 m away
- 5906 North West PlFeb 6, 2024Express: window replacement · 113 m away
- 5905 Lookout Mountain DrMar 31, 2025Emergency disconnect and reconnect needed. a phase in panel #2 on the right the 150 amp panel a phase main feeder was loose and is currently melting and arching replacing all damaged components. not touching 200 amp panel · 118 m away