4901 Beverly Skyline
Austin, TX 78731
4901 Beverly Skyline: 2 projects on record
City of Austin lists 2 filings across 2 projects at 4901 Beverly Skyline, Austin, TX 78731 since April 26, 2024. The most recent, filed May 7, 2025, covers: “Replacement of mini-split system like for like: replace 1 ton mini-split system”.
Compiled from City of Austin records · updated May 7, 2025
- Projects
- 2
- 2 filings
- Latest filing
- May 7, 2025
- since Apr 26, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of mini-split system like for like: replace 1 ton mini-split system
- AppliedApr 29, 2025
- IssuedMay 7, 2025
- WorkMay '25 – Feb '26
- Final inspectionFeb 18, 2026
Passed final inspection Feb 18, 2026.
1 contact on this project · 1 phone number
Permit & project history
2 projectsReplacement of mini-split system like for like: replace 1 ton mini-split system
Replacement of mini-split system like for like: replace 1 ton mini-split system
City of Austin permitMechanical PermitFinal- Record
- 2025-052561 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replacement of an existing water heater
Replacement of an existing water heater
City of Austin permitPlumbing PermitFinal- Record
- 2024-050578 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 4901 Beverly Skyline
What is being built at 4901 Beverly Skyline?
The latest filing (City of Austin permit 2025-052561 MP, May 7, 2025) covers replacement of mini-split system like for like: replace 1 ton mini-split system.
How many permits and filings does 4901 Beverly Skyline have?
2 filings across 2 projects, from April 26, 2024 to May 7, 2025.
Is there other construction near 4901 Beverly Skyline?
Yes. Nearby filings include 4904 Beverly Skyline (temporary disconnect required for full service upgrade to 200a. includes new 200a mdp 200a ae meter can and new riser and mast. includes updating of wire run to interior subpanel to bring it up to code. includes installation of level 2 ev charger in attached garage, Sep 21, 2026); 4907 Beverly Skyline (add 240v line for car charger, Mar 5, 2025); 4907 Beverly Hills Dr (new 200 amp overhead service with mast through roof. replace panel in garage, Sep 10, 2024).
How do I get alerts for new permits at 4901 Beverly Skyline?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78731- 4904 Beverly SkylineSep 21, 2026Temporary disconnect required for full service upgrade to 200a. includes new 200a mdp 200a ae meter can and new riser and mast. includes updating of wire run to interior subpanel to bring it up to code. includes installation of level 2 ev charger in attached garage · 78 m away
- 4907 Beverly SkylineMar 5, 2025Add 240v line for car charger · 92 m away
- 4907 Beverly Hills DrSep 10, 2024New 200 amp overhead service with mast through roof. replace panel in garage · 94 m away
- 4908 Beverly SkylineFeb 2, 2026Replacing both tankless water heaters · 110 m away
- 4918 Westview DrAug 21, 2026Replacement of an existing water heater 50gal gas tank · 143 m away
- 4914 Westview DrMay 30, 20255/30/25 sm - sfr storm damage (riser meter and mp were detached from the stand alone pole). replaced weather head and resecured all components. repair/rebuild existing pole mounted oh service that was torn from the pole during the weather event on 5/28/25. triplex feeding property is still live and is currently laying on the ground. power is being supplied to the property through a pad mounted generator via the existing main panel which is also on the ground currently. request emergency disconnect of property to begin emergency repair of service entrance · 161 m away
- 5009 Westview DrDec 15, 2023Tee into external gas line and run additional line for generator installation · 173 m away
- 5001 Westview DrJun 2, 2026Eplan: residential expedited review - new construction of a 2 story single family residence 4 bedroom 4.5 bathroom covered patio & uncovered wood deck attached 2-car garage · 182 m away
- 5005 Westview DrJun 17, 2025Water yard line from meter to home roughly 10ft 6/18/25 sm - approximately 35 of line was replaced. mix of pvc and pex connected to original copper. prv and shutoff installed · 185 m away
- 5007 Westview DrOct 10, 2024Replacement of complete existing central heat and air system with or without duct work · 187 m away
- 5004 Beverly Hills DrAug 25, 2026Express: shower to shower replacement (prefab base) in the same location · 192 m away
- 4917 Westview DrMay 6, 2026Replacement of complete existing central heat and air system with or without duct work · 197 m away