5319 Backtrail Dr
Austin, TX 78731
Plumbing repairs and replacements at 5319 Backtrail Dr
Austin permits show plumbing work at the existing home, including a drain replacement, a gas line replacement and a water heater replacement. The permits were filed from October 14, 2025, through September 8, 2026.
Summarized from City of Austin records · updated Sep 8, 2026
- Projects
- 3
- 3 filings
- Latest filing
- Sep 8, 2026
- since Oct 14, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledNatural gas water heater replacement
- AppliedSep 1, 2026
- IssuedSep 8, 2026
- WorkSep '26 – Sep '26
- Final inspectionSep 16, 2026
Passed final inspection Sep 16, 2026.
1 contact on this project · 1 phone number
Permit & project history
3 projectsNatural gas water heater replacement
Natural gas water heater replacement
City of Austin permitPlumbing PermitFinal- Record
- 2026-114985 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Gas line replacement yard this scope of work includes replacing the existing gas line from the gas meter at the street to the home. the gas meter is located approximately 10 feet lower than the elevation of the home and the work area is extremely rocky with numerous cedar trees surrounding the proposed trench path. these site conditions will require additional care and labor during excavation and installation. the new 2 gas line will be installed starting at the existing gas meter and routed up the existing rock ledge. from the rock ledge the new gas line will transition into a new trench that will be excavated approximately 80 feet to the home. the trench will be excavated to a minimum depth of 18 inches as required by applicable plumbing and gas codes. due to the rocky soil conditions and the presence of cedar trees along the trench route excavation will be performed carefully to minimize disturbance to the surrounding area. once the trench is prepared the new gas line will be installed and connected to the existing gas piping at the home. upon completion of the installation the new gas piping will be placed under the required pressure test to verify the system is properly installed and that no gas leaks are present. a city gas inspection will then be scheduled and performed. after the gas inspection has been completed and the installation has passed inspection the trench will be backfilled and the work area will be cleaned. excavated debris and construction-related debris will be hauled off from the job site. scope includes: * replace existing gas line from the street-side gas meter to the home. * install approximately 80 feet of new 2 gas line. * route new gas line up the existing rock ledge from the meter. * excavate approximately 80 feet of trench at a minimum depth of 18 inches. * carefully excavate through rocky soil and around existing cedar trees. * connect new gas line to the existing gas piping at the home. * pressure test the new gas l
Gas line replacement yard this scope of work includes replacing the existing gas line from the gas meter at the street to the home. the gas meter is located approximately 10 feet lower than the elevation of the home and the work area is extremely rocky with numerous cedar trees surrounding the proposed trench path. these site conditions will require additional care and labor during excavation and installation. the new 2 gas line will be installed starting at the existing gas meter and routed up the existing rock ledge. from the rock ledge the new gas line will transition into a new trench that will be excavated approximately 80 feet to the home. the trench will be excavated to a minimum depth of 18 inches as required by applicable plumbing and gas codes. due to the rocky soil conditions and the presence of cedar trees along the trench route excavation will be performed carefully to minimize disturbance to the surrounding area. once the trench is prepared the new gas line will be installed and connected to the existing gas piping at the home. upon completion of the installation the new gas piping will be placed under the required pressure test to verify the system is properly installed and that no gas leaks are present. a city gas inspection will then be scheduled and performed. after the gas inspection has been completed and the installation has passed inspection the trench will be backfilled and the work area will be cleaned. excavated debris and construction-related debris will be hauled off from the job site. scope includes: * replace existing gas line from the street-side gas meter to the home. * install approximately 80 feet of new 2 gas line. * route new gas line up the existing rock ledge from the meter. * excavate approximately 80 feet of trench at a minimum depth of 18 inches. * carefully excavate through rocky soil and around existing cedar trees. * connect new gas line to the existing gas piping at the home. * pressure test the new gas l
City of Austin permitPlumbing PermitFinal- Record
- 2026-106197 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Drain replacement under slab/crawlspace: multiple bellies under the slab. existing pipe is pvc. new pipe will be pvc. about 100 feet of pipe will be replaced. there are also two spots in the building sewer in the yard that will be repaired
Drain replacement under slab/crawlspace: multiple bellies under the slab. existing pipe is pvc. new pipe will be pvc. about 100 feet of pipe will be replaced. there are also two spots in the building sewer in the yard that will be repaired
City of Austin permitPlumbing PermitFinal- Record
- 2025-130265 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 5319 Backtrail Dr
What is being built at 5319 Backtrail Dr?
The permits describe repairs and replacements at an existing home, not a new building. Work includes drain piping, a gas line and a natural gas water heater.
What plumbing work is permitted at 5319 Backtrail Dr?
The records include a drain replacement filed October 14, 2025, a gas line replacement filed August 18, 2026, and a water heater replacement filed September 8, 2026.
Is the gas line being replaced at 5319 Backtrail Dr?
Yes. Austin permit 2026-106197 PP, filed August 18, 2026, describes replacing the line from the street-side gas meter to the home with about 80 feet of new gas line.
Is a new water heater going in at 5319 Backtrail Dr?
A permit filed September 8, 2026, describes a natural gas water heater replacement. The record is permit 2026-114985 PP.
What drain work is planned at 5319 Backtrail Dr?
Permit 2025-130265 PP, filed October 14, 2025, describes replacing about 100 feet of drain pipe under the slab or crawlspace and repairing two spots in the yard's building sewer.
When were permits filed for work at 5319 Backtrail Dr?
The three Austin permits were filed October 14, 2025, August 18, 2026, and September 8, 2026.
Also being built nearby
All of 78731- 5314 Backtrail DrMar 7, 2024Express - replacing 1 window and 3 doors like for like · 56 m away
- 6601 Ladera NorteDec 20, 2024Replacement of complete existing central heat and air system with or without duct work horizontal 2 stage gas · 61 m away
- 5310 Backtrail DrFeb 13, 2025Request to disconnect installation of 200 amp transfer switch on service with existing 200 amp meter to remain · 80 m away
- 6524 Ladera NorteOct 23, 2025Addition/ remodel of existing 2-story single-family residential to include: small addition to basement level expanding bedroom; interior remodel of this area to include laundry room and 2 full baths; expanding primary bedroom and bathroom on 1st floor; interior remodel of 1st floor to include kitchen entry; new roof with solar panels · 92 m away
- 5308 Backtrail DrNov 5, 2026Base: installing a backup battery system and additional meter socket · 114 m away
- 5311 Backtrail DrSep 20, 2024Install new 8.20kw rooftop solar system and 13.5kw energy storage system for existing residential only · 130 m away
- 6702 Ladera NorteMar 17, 2026Replacement of an existing water heater replace 50-gallon gas water heater location: garage closet · 150 m away
- 6520 Ladera NorteMay 31, 2024Replace existing arbor & patio with new covered patio at rear of home · 152 m away
- 5304 Backtrail DrDec 9, 2024Install ev charger in garage · 170 m away
- 6704 Ladera NorteNov 18, 2025Install new 3.22 kw dc rooftop solar system · 177 m away
- 6518 Ladera NorteOct 28, 2026Base: installing a backup battery system and additional meter socket · 180 m away
- 5003 Smokey ValleyMay 23, 2025Replacement of condenser only 3ton-cond-elec-14s-ss (condenser only) · 186 m away