5605 Blueridge Ct
Austin, TX 78731
Sanitary sewer pipe repair permitted at 5605 Blueridge Ct
A plumbing permit indicates a small section of broken sanitary sewer piping will be replaced at 5605 Blueridge Ct. The City of Austin issued the permit on November 11, 2025; the work involves tunneling about 8 feet beneath the concrete slab.
Summarized from City of Austin records · updated Nov 11, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Nov 11, 2025
- since Nov 11, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledTunnel approximately 8 under the concrete slab and replace a small broken section of sanitary sewer piping
- AppliedOct 29, 2025
- IssuedNov 11, 2025
- WorkNov '25 – Nov '25
- Final inspectionNov 24, 2025
Passed final inspection Nov 24, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 projectTunnel approximately 8 under the concrete slab and replace a small broken section of sanitary sewer piping
Tunnel approximately 8 under the concrete slab and replace a small broken section of sanitary sewer piping
City of Austin permitPlumbing PermitFinal- Record
- 2025-139655 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 5605 Blueridge Ct
What is being built at 5605 Blueridge Ct?
The City of Austin permit describes sewer pipe repair, not a new building. The work involves tunneling about 8 feet under the concrete slab and replacing a small broken section of sanitary sewer piping.
What is the permit number for work at 5605 Blueridge Ct?
The permit number is 2025-139655 PP. The City of Austin issued it on November 11, 2025.
When was the sewer repair permitted at 5605 Blueridge Ct?
The City of Austin permit was filed on November 11, 2025. Its status is listed as Final.
Is a new home being built at 5605 Blueridge Ct?
The permit record does not describe new home construction. It describes tunneling beneath the slab to replace a small broken section of sanitary sewer piping.
What plumbing work is planned at 5605 Blueridge Ct in Austin?
Permit 2025-139655 PP describes a tunnel approximately 8 feet under the concrete slab and replacement of a small broken section of sanitary sewer piping. It was issued November 11, 2025.
Also being built nearby
All of 78731- 5604 Lemonwood DrApr 26, 2024Replacement of complete existing central heat and air system with or without duct work · 33 m away
- 6406 Sprucewood DrNov 7, 20242 inch kitchen sink line with bellies needed repair in tunnel job · 55 m away
- 6408 Sprucewood DrMar 2, 2007Lakewood village, amended plat of lots 9 & 10, block a — lakewood village, amended plat of lots 9 & 10, block a · 84 m away
- 6400 Sprucewood DrJan 16, 2024Install 13.77 kw dc solar system · 90 m away
- 5600 Blueridge CtDec 22, 2025Replacement of complete existing central heat and air system with or without duct work replace current system with new 5 ton single stage goodman system. new glxs4 condenser and horizontal coil on r32 refrigerant with gr9s furnace · 118 m away
- 5601 Lemonwood DrApr 4, 2024Install new gas line for generator · 127 m away
- 5601 Driftwood DrFeb 6, 2024Corner lot; construct new sidewalks of 240 lf with ada ramps and new driveway approach of 20 ft · 136 m away
- 5705 Driftwood DrJan 6, 2026Express- install 7 push piers and 1 helical pier · 142 m away
- 5509 Lemonwood DrOct 6, 2026Addition of a new covered porch to rear of existing 2-story dwelling unit. convert 94 sq ft of existing covered porch into a conditioned breakfast room. comprehensive interior remodel. roll in scope of work from expired bp#: 2009-060220 (enlarge 2 windows in the master bedroom on the existing single family residence) · 150 m away
- 6316 Sprucewood CvNov 16, 2023Replace existing water heater · 153 m away
- 5502 Blueridge CtOct 2, 2024New construction in-ground pool and spa · 154 m away
- 5708 Driftwood DrMar 11, 2026Replacement of complete existing central heat and air system with or without duct work install replacement of 2 ton heat pump · 154 m away