5802 Lakeview Cir
Austin, TX 78731
5802 Lakeview Cir: 1 project on record
City of Austin lists 1 filing across 1 project at 5802 Lakeview Cir, Austin, TX 78731. The most recent, filed March 26, 2025, covers: “Express replacing 23 existing windows”.
Compiled from City of Austin records · updated Mar 26, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Mar 26, 2025
- since Mar 26, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledExpress replacing 23 existing windows
- AppliedJan 19, 2024
- IssuedMar 26, 2025
- WorkMar '25 – Apr '25
- Final inspectionApr 4, 2025
Passed final inspection Apr 4, 2025.
2 contacts on this project · 2 phone numbers
Permit & project history
1 projectExpress replacing 23 existing windows
Express replacing 23 existing windows
City of Austin permitBuilding PermitFinal- Record
- 2024-006925 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 5802 Lakeview Cir
What is being built at 5802 Lakeview Cir?
The latest filing (City of Austin permit 2024-006925 BP, March 26, 2025) covers express replacing 23 existing windows.
How many permits and filings does 5802 Lakeview Cir have?
1 filing across 1 project, from March 26, 2025 to March 26, 2025.
Is there other construction near 5802 Lakeview Cir?
Yes. Nearby filings include 5803 Lakeview Cir (125ft tunnel to replace sewer line, Jan 22, 2026); 4711 Lookout Mountain Cv (request to disconnect contractor temporarily disconnect required to tie in pv/ess components. we are not upgrading the size of the service not upgrading the meter size, May 28, 2024); 5810 Westslope Dr (tunnel below the foundation to repair drain lines, Mar 12, 2024).
How do I get alerts for new permits at 5802 Lakeview Cir?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78731- 5803 Lakeview CirJan 22, 2026125ft tunnel to replace sewer line · 61 m away
- 4711 Lookout Mountain CvMay 28, 2024Request to disconnect contractor temporarily disconnect required to tie in pv/ess components. we are not upgrading the size of the service not upgrading the meter size · 77 m away
- 5810 Westslope DrMar 12, 2024Tunnel below the foundation to repair drain lines · 79 m away
- 4705 Lookout Mountain CvAug 12, 2025Replacement of complete existing central heat and air system with or without duct work · 88 m away
- 4712 Lookout Mountain CvJan 26, 2026Run 1 in gas line from gas meter along the side of the house to new generator location approx. 10 feet away · 103 m away
- 5906 Lookout Mountain DrMay 15, 2024Replace 2 electric water heaters with hybrid proterra · 112 m away
- 4710 Lookout Mountain CvMay 4, 2026Replacement of complete existing central heat and air system with or without duct work like for like: 5 ton 2 stage horizontal gas - upstairs · 122 m away
- 5807 Valley CirMay 2, 2025Express: window replacement (two windows like for like) · 123 m away
- 4708 Westslope CirAug 2, 2024Install level 2 ev charger · 126 m away
- 5805 Valley CirDec 20, 2024Replace (2) electric wh with (2) electric hybrid heat pump wh · 138 m away
- 4710 Westslope CirNov 4, 2025Reroute 3 water lines that were previously in the retaining wall · 140 m away
- 5816 Westslope DrSep 30, 2026Replace cast iron pipe under slab · 147 m away