5806 Trailridge Cir
Austin, TX 78731
5806 Trailridge Cir: 1 project on record
City of Austin lists 1 filing across 1 project at 5806 Trailridge Cir, Austin, TX 78731. The most recent, filed June 5, 2024, covers: “Replacement of mini-split system”.
Compiled from City of Austin records · updated Jun 5, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Jun 5, 2024
- since Jun 5, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of mini-split system
- AppliedMay 30, 2024
- IssuedJun 5, 2024
- WorkJun '24 – Dec '24
- Final inspectionJul 19, 2024
Passed final inspection Jul 19, 2024.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplacement of mini-split system
Replacement of mini-split system
City of Austin permitMechanical PermitFinal- Record
- 2024-067803 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 5806 Trailridge Cir
What is being built at 5806 Trailridge Cir?
The latest filing (City of Austin permit 2024-067803 MP, June 5, 2024) covers replacement of mini-split system.
How many permits and filings does 5806 Trailridge Cir have?
1 filing across 1 project, from June 5, 2024 to June 5, 2024.
Is there other construction near 5806 Trailridge Cir?
Yes. Nearby filings include 5808 Trailridge Cir (replacement of complete existing central heat and air system with or without duct work, Jun 3, 2024); 5807 Overlook Dr (replacement of an existing water heater, Sep 10, 2026); 5803 Trailridge Dr (replacement of complete existing central heat and air system with or without duct work, Apr 12, 2024).
How do I get alerts for new permits at 5806 Trailridge Cir?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78731- 5808 Trailridge CirJun 3, 2024Replacement of complete existing central heat and air system with or without duct work · 22 m away
- 5807 Overlook DrSep 10, 2026Replacement of an existing water heater · 60 m away
- 5803 Trailridge DrApr 12, 2024Replacement of complete existing central heat and air system with or without duct work · 61 m away
- 5901 Overlook DrJun 4, 2024Replacement of an existing water heater · 81 m away
- 5801 Trailridge CirNov 16, 2026Replacement of complete existing central heat and air system with or without duct work · 94 m away
- 5818 Balcones DrNov 6, 2026Remove existing roof and components replace tpo roof and components. no structural framing building footprint change or change to drain locations. existing office building · 96 m away
- 5903 Overlook DrOct 26, 2026Eplan: residential expedited review - addition and remodel to existing 2-story single family res. [3bed 3bath] work to include: first floor interior remodel first floor addition new bed new half bath [4bed 3.5bath] · 99 m away
- 5802 Trailridge DrMay 28, 2025Replacing existing 200 amp oh service riser meter can and panel. installing grounding and surge protector · 104 m away
- 5802 Overlook DrDec 14, 2023Emergency upgrade overhead service 150 to 200amp · 110 m away
- 5800 Overlook DrMay 21, 2025Express - remove and replace 16 windows: like for like no structural changes · 115 m away
- 5711 Trailridge DrJun 27, 2025Re pipe sewer system under home and also the sewer line to the street. a tunnel of approximately 40 feet from the corner of the home to the city cleanout will be excavated. another 90 foot tunnel will be excavated under the slab to access underneath the home · 117 m away
- 5840 Balcones DrJul 27, 2026Repairing storefront like for like · 120 m away