5905 Tumbling Cir
Austin, TX 78731
EV charger and HVAC work permitted at 5905 Tumbling Cir
City of Austin permits indicate an EV charger installation and replacement of an existing central heating and air system at this residence. The HVAC permit was filed Jan. 3, 2025, and the electrical permit for the charger was filed Sept. 16, 2025; both are marked final.
Summarized from City of Austin records · updated Sep 16, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Sep 16, 2025
- since Jan 3, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledEv charger installation
- AppliedSep 15, 2025
- IssuedSep 16, 2025
- WorkSep '25 – Mar '26
- Final inspectionOct 2, 2025
Passed final inspection Oct 2, 2025.
1 contact on this project · 1 phone number
Permit & project history
2 projectsEv charger installation
Ev charger installation
City of Austin permitElectrical PermitFinal- Record
- 2025-117374 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replacement of complete existing central heat and air system with or without duct work 1.5 ton gas system
Replacement of complete existing central heat and air system with or without duct work 1.5 ton gas system
City of Austin permitMechanical PermitFinal- Record
- 2024-167235 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 5905 Tumbling Cir
What is being built at 5905 Tumbling Cir?
The City of Austin records show permits for an EV charger installation and replacement of the home's existing central heating and air system. They do not indicate a new building.
Is an EV charger being installed at 5905 Tumbling Cir?
Yes. Electrical permit 2025-117374 EP, filed Sept. 16, 2025, is for an EV charger installation and is marked final.
When was the HVAC work at 5905 Tumbling Cir permitted?
The mechanical permit was filed Jan. 3, 2025. It covers replacement of the existing central heat and air system with a 1.5-ton gas system.
What are the permit numbers for 5905 Tumbling Cir?
The records list electrical permit 2025-117374 EP for the EV charger and mechanical permit 2024-167235 MP for the heating and air system replacement.
Are the permits for 5905 Tumbling Cir final?
Yes. Both City of Austin permit records are marked final: the HVAC permit is dated Jan. 3, 2025, and the EV charger permit is dated Sept. 16, 2025.
Also being built nearby
All of 78731- 5932 Highland Hills DrOct 30, 2026Express- foundation repair · 27 m away
- 5928 Highland Hills DrFeb 13, 2026200amp panel 200amp meter base grounding bonding overhead service · 42 m away
- 5931 Highland Hills DrOct 27, 2026Replacement of an existing water heater replacing gas water heater with similar model · 75 m away
- 5929 Highland Hills DrMay 28, 2026Express - replacing 11 windows like for like in existing residential home · 77 m away
- 5942 Highland Hills DrNov 20, 2023Replacement of complete existing central heat and air system with or without duct work · 80 m away
- 5935 Highland Hills DrMay 8, 2025Replacement of an existing water heater replace existing 40 gal ng water heater in interior closet with current equivalent · 86 m away
- 5925 Highland Hills DrMar 17, 2026Replacement of complete existing central heat and air system with or without duct work wollenben · 96 m away
- 3519 Highland View DrSep 16, 2025Replacement of complete existing central heat and air system with or without duct work like for like: 5 ton horizontal gas system · 116 m away
- 3409 Westside CvSep 25, 2025Express: replace 2 windows and 1 door like for like · 118 m away
- 3512 Highland View DrDec 16, 2025Express: replace one window like for like · 127 m away
- 3514 Highland View DrSep 9, 2024Sewer line permit · 128 m away
- 3520 Highland View DrJan 17, 2024Change out water heater · 129 m away