5925 Overlook Dr
Austin, TX 78731
Main water line replacement permitted at 5925 Overlook Dr
A City of Austin plumbing permit indicates the existing main water line at 5925 Overlook Dr is being replaced with PEX. The permit, 2025-147375 PP, was filed on November 18, 2025, and is marked final.
Summarized from City of Austin records · updated Nov 18, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Nov 18, 2025
- since Nov 18, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledWe are to replace the existing main water line with pex
- AppliedNov 17, 2025
- IssuedNov 18, 2025
- WorkNov '25 – Nov '25
- Final inspectionNov 24, 2025
Passed final inspection Nov 24, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 projectWe are to replace the existing main water line with pex
We are to replace the existing main water line with pex
City of Austin permitPlumbing PermitFinal- Record
- 2025-147375 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 5925 Overlook Dr
What is being built at 5925 Overlook Dr in Austin?
The permit records a replacement of the existing main water line with PEX, not a new building. Permit 2025-147375 PP was filed November 18, 2025.
Was a new home permitted at 5925 Overlook Dr?
The available City of Austin record is for plumbing work replacing the existing main water line with PEX. It does not describe a new home.
When was the plumbing permit for 5925 Overlook Dr filed?
The City of Austin filed permit 2025-147375 PP on November 18, 2025. Its status is listed as final.
What does permit 2025-147375 PP cover?
It covers replacement of the existing main water line with PEX at 5925 Overlook Dr in Austin.
Is construction planned at 5925 Overlook Dr?
The record indicates plumbing work to replace the existing main water line with PEX. It does not provide a construction schedule.
Also being built nearby
All of 78731- 6001 Westside DrApr 23, 2025200amp service upgrade · 27 m away
- 5923 Overlook DrDec 6, 2024Replacement of complete existing central heat and air system with or without duct work 2 ton two stage horiz gas · 65 m away
- 5904 Overlook DrMar 2, 2007Marino's subdivision — marino's subdivision · 78 m away
- 5921 Overlook DrJan 30, 2024Replacement of complete existing central heat and air system with or without duct work · 80 m away
- 5807 Timber TrlNov 6, 2026Interior remodel of an existing one-story single-family residence · 91 m away
- 5919 Overlook DrSep 5, 2024Replacement of complete existing central heat and air system with or without duct work · 102 m away
- 5805 Timber TrlMay 22, 2024New pool with spa · 103 m away
- 5925 Highland Hills DrMar 17, 2026Replacement of complete existing central heat and air system with or without duct work wollenben · 113 m away
- 6102 Westside DrOct 28, 2024Express: 5 windows replaced 1 single entry door replaced · 120 m away
- 5823 Trailridge DrNov 4, 2026Install level 2 ev charger · 142 m away
- 5911 Overlook DrMar 11, 2026Gas line addition from meter to generator · 143 m away
- 5909 Overlook DrJun 12, 2026Replacement of complete existing central heat and air system with or without duct work hvac changeout/ alteration · 145 m away