6417 Williams Ridge Way

Austin, TX 78731

Gas-line and electrical work at 6417 Williams Ridge Way

City of Austin records show utility and electrical work at the existing home, including a gas-line installation permitted on September 30, 2025. Other records cover a request related to a replacement 200-amp electrical panel, gas and water line repairs, and a porch conversion.

Summarized from City of Austin records · updated Sep 30, 2025

Projects
4
4 filings
Latest filing
Sep 30, 2025
since Aug 1, 2024
Largest scope
—
Listed value
—

Where this project stands

Finaled

We installed a 1 inch gas line in the existing trench in the backyard of the home. it was stubbed out of the ground with black iron pipe on each end of the gas line. it was also connected to the main gas supply from the city meter using 1 inch fittings. 6417 williams ridge way austin tx 78731

  1. AppliedSep 25, 2025
  2. IssuedSep 30, 2025
  3. WorkSep '25 – Oct '25
  4. Final inspectionOct 27, 2025

Passed final inspection Oct 27, 2025.

1 contact on this project · 1 phone number

Permit & project history

4 projects
  1. We installed a 1 inch gas line in the existing trench in the backyard of the home. it was stubbed out of the ground with black iron pipe on each end of the gas line. it was also connected to the main gas supply from the city meter using 1 inch fittings. 6417 williams ridge way austin tx 78731

    We installed a 1 inch gas line in the existing trench in the backyard of the home. it was stubbed out of the ground with black iron pipe on each end of the gas line. it was also connected to the main gas supply from the city meter using 1 inch fittings. 6417 williams ridge way austin tx 78731

    City of Austin permitPlumbing PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Request to disconnect installation of replacement 200-amp main breaker panel

    Request to disconnect installation of replacement 200-amp main breaker panel

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  3. *partial demolition* conversion of a portion of front covered porch into expanded living room

    *partial demolition* conversion of a portion of front covered porch into expanded living room

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  4. Replace 25ft of gas line and water line for leak repair

    Replace 25ft of gas line and water line for leak repair

    City of Austin permitPlumbing PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 6417 Williams Ridge Way

What work was permitted at 6417 Williams Ridge Way?

City records include a gas-line installation, work related to a replacement 200-amp electrical panel, gas and water line repairs, and a conversion of part of the covered porch into living space.

Was a new home permitted at 6417 Williams Ridge Way?

The records provided describe work at an existing home, not construction of a new home.

When was the gas-line work permitted at 6417 Williams Ridge Way?

The City of Austin plumbing permit, 2025-122122 PP, is dated September 30, 2025. Its description says a 1-inch gas line was installed in an existing backyard trench.

What electrical work was filed at 6417 Williams Ridge Way?

Electrical permit 2024-094862 EP, dated August 1, 2024, was a request to disconnect installation of a replacement 200-amp main breaker panel. The permit status is final.

Were gas or water lines repaired at 6417 Williams Ridge Way?

Yes. Plumbing permit 2023-093656 PP, dated July 27, 2023, describes replacing 25 feet of gas and water line for leak repair.

Was part of the porch converted to living space at 6417 Williams Ridge Way?

A City of Austin record dated September 1, 2023, describes partial demolition to convert part of the front covered porch into an expanded living room.