groundranger
Historic · latest filing Apr 2024Residential

6516 Ladera Norte

Austin, TX 78731

6516 Ladera Norte: 2 projects on record

City of Austin lists 2 filings across 2 projects at 6516 Ladera Norte, Austin, TX 78731 since March 28, 2024. The most recent, filed April 2, 2024, covers: “Install 13.5 energy storage system for existing residential only”.

Compiled from City of Austin records · updated Apr 2, 2024

Projects
2
2 filings
Latest filing
Apr 2, 2024
since Mar 28, 2024
Largest scope
—
Listed value
—

Where this project stands

Finaled

Install 13.5 energy storage system for existing residential only

  1. AppliedMar 25, 2024
  2. IssuedApr 2, 2024
  3. WorkApr '24 – Jul '24
  4. Final inspectionJul 1, 2024

Passed final inspection Jul 1, 2024.

1 contact on this project · 1 phone number

Permit & project history

2 projects
  1. Install 13.5 energy storage system for existing residential only

    Install 13.5 energy storage system for existing residential only

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Request to disconnect contractor temporarily disconnect required to tie in pv/ess components. we are not upgrading the size of the service not upgrading the meter size

    Request to disconnect contractor temporarily disconnect required to tie in pv/ess components. we are not upgrading the size of the service not upgrading the meter size

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 6516 Ladera Norte

What is being built at 6516 Ladera Norte?

The latest filing (City of Austin permit 2024-036745 EP, April 2, 2024) covers install 13.5 energy storage system for existing residential only.

How many permits and filings does 6516 Ladera Norte have?

2 filings across 2 projects, from March 28, 2024 to April 2, 2024.

Is there other construction near 6516 Ladera Norte?

Yes. Nearby filings include 6514 Ladera Norte (replacement of complete existing central heat and air system with or without duct work, Apr 18, 2024); 6518 Ladera Norte (base: installing a backup battery system and additional meter socket, Oct 28, 2026); 6512 Ladera Norte (replace back flow device to irrigation system, Jun 11, 2024).

How do I get alerts for new permits at 6516 Ladera Norte?

Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.

Also being built nearby

All of 78731

More warehouses & industrial in 78731, solar installs in 78731.

Email me when a new permit is filed