6907 Ladera Norte

Austin, TX 78731

Home repairs at 6907 Ladera Norte

City of Austin permits indicate repairs and system work at an existing home, not a new building. The latest permit, filed June 30, 2026, covers excavation and tunneling under the slab to repair two drain leaks; a February 4, 2026 permit covers replacement of the central heating and air system.

Summarized from City of Austin records · updated Jun 30, 2026

Projects
3
3 filings
Latest filing
Jun 30, 2026
since Feb 4, 2026
Largest scope
—
Listed value
—

Where this project stands

Finaled

Excavate in yard and tunnel under slab to expose and repair 2 drain leaks

  1. AppliedJun 2, 2026
  2. IssuedJun 30, 2026
  3. WorkJun '26 – Sep '26
  4. Final inspectionSep 4, 2026

Passed final inspection Sep 4, 2026.

1 contact on this project · 1 phone number

Permit & project history

3 projects
  1. Excavate in yard and tunnel under slab to expose and repair 2 drain leaks

    Excavate in yard and tunnel under slab to expose and repair 2 drain leaks

    City of Austin permitPlumbing PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Replacement of complete existing central heat and air system with or without duct work hvac change out

    Replacement of complete existing central heat and air system with or without duct work hvac change out

    City of Austin permitMechanical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  3. Express foundation repair 8 push piers to stabilize home

    Express foundation repair 8 push piers to stabilize home

    City of Austin permitBuilding PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 6907 Ladera Norte

What is happening at 6907 Ladera Norte?

City of Austin permits indicate repairs to an existing home, including drain-leak repairs and replacement of the central heating and air system. The records do not describe a new building.

What is being built at 6907 Ladera Norte?

The permits describe home repairs rather than new construction. The latest filing covers excavation and tunneling under the slab to repair two drain leaks.

When was the latest permit filed for 6907 Ladera Norte?

The latest listed permit was filed June 30, 2026. Permit 2026-070024 PP is for plumbing work to expose and repair two drain leaks.

Was an HVAC system replacement permitted at 6907 Ladera Norte?

Yes. Permit 2026-011355 MP, filed February 4, 2026, covers replacement of the existing central heating and air system, with or without duct work.

Was foundation work permitted at 6907 Ladera Norte?

Yes. A building permit filed November 8, 2023, covers installation of eight push piers to stabilize the home’s foundation.